Forwards IE Insp Rept 50-454/79-01 & 50-455/79-01 on 790109-11 & Notice of Violation
ML19282C296
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/12/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19282C297 List:
References
NUDOCS 7903220493
Download: ML19282C296 (2)


See also: IR 05000454/1979001

Text

P

.

_

  1. "%

7kk

uunco s m es

/

'k

NUCLEAR REGULATORY COMMISSION

[ g' @ .7 j

j

l

REGloN til

799 ROOSEVELT RoAo

%

y.

G LE N E LLY N. ILLINolS 60137

  • "**

FEBlt

J79

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Bryon Lee, Jr.

Vice President

P. O. Box /67

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Konklin,

K. R. Naidu, P. A. Barrett and J. F. Suermann of this office

on January 9-11, 1979, of activities at Byron Nuclear Generating

Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-130 and CPPR-131 and to the discussion of our findings

with Mr. McIntyre and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you

to submit to this office within thirty days of your receipt

of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action

to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, the enclosures, and your response to

this letter will be placed in the NRC's Public Document Room,

79032204B

.

.

FEB19

' 79

r

Commonwealth Edison

-2-

~

'

Company

except as follows.

If the enclosures contain information

that you or your contractors believe to be proprietary, you

must apply in writing to this offir.c, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure. The application must include a full

statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that prcyrietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

e J/S

n

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-454/79-01 and

No. 50-455/79-01

cc w/ enc 1:

Gunnar Sorensen, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

.