Forwards IE Insp Repts 50-373/79-02 & 50-374/79-03 on 790111.No Noncompliance Noted
ML19282C268
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/12/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19282C269 List:
References
NUDOCS 7903220458
Download: ML19282C268 (2)


See also: IR 05000373/1979002

Text

T

.

c# "%

UNITED STATES

.

.

NUCLEAR REGULATORY COMMISSION

'

f

j

'

REGION 111

,

-

t

799 RooSEVE LT RoAo

G LE N E LL YN, ILLINolS 60137

6 g,

FEB 12 .379

  • " *

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. By ron Lee , Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. J. H. Neisler

and F. C. Hawkins of this office on Janaury 11, 1979, of activities

at La Salle County Nuclear Station, Units 1 and 2, authorized by

NRC Construction Permits No. CPPR-99 and No. CPPR-100 and to the

discussion of our findings with Mr. L. J. Burke at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include

a full statement of the reasons for wni-h the information is con-

sidered proprietary, and should be preparei so that proprietary

information identified in the application is contained in an

enclosure to the application.

-83 zwisf

,

_

'

FEB 19

  • 74

1

Com=onwealth Edison

-2-

-

Coapany

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

O

, F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Ettelosure :

Ir Inspection

Reports Nr. 50-373/78-02

and No. 50-374/79-03

cc w/ encl:

Mr. L. J. Burke, Sit

Project Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office

of Assistant Attorney General

=

r

9

d

h

r

h

>