ML19282B570
| ML19282B570 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/28/1979 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19282B571 | List: |
| References | |
| NUDOCS 7903150400 | |
| Download: ML19282B570 (2) | |
See also: IR 05000373/1978032
Text
e
,-
~.
w -
d
/%,
UNITED STATES
t
t
NUCLE AR REGULATORY COMMISSION
\\*
l
m
REGloN Hi
y j
n
-
j
~; i
g
G LE N E wt v N t L L ' N o t s 6 013 7
4-
- 4y
4,
-
....-
FEB1
,gg
Docket No.30-373
Docket No. 50-374
Co=monwealth Edison Company
ATTN:
Mr. Byron Lee, Jr.
Vice President
P. O. Box 767
Chicago, IL 60690
Gentlemen:
This refers to the meeting on November 30, 1978, between
Messrs. R. F. Heishman, H. C. Phillips of this office and Mr. L. J.
Burke and others of your staff.
It also refers to a subsequent
F. J. Jablonski,
inspection, conducted by Messrs. P. A. Barrett,
G. F. Maxwell, J. H. Neisler, and H. S. Phillips of this office on
December 13, 14, 18, 19, and 20, 1978, of activities at your head-
quarters offices, in Chicago, Illinois, and at La Salle County
Nuclear Station, Units 1 and 2, authorized by NRC Construction
Permits No. CPPR-99 and No. CPPR-100 and to the discussion of our
findings with Messrs. W. J. Shewski, G. F. Marcus, L. J. Burke, and
others of your staff at the conclusion of the inspections.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and i:.terviews with personnel.
'
Our inspectors also reviewed additional supporting information con-
~
cerning a previously identified apparent item of noncompliance
(373/78-02-07; 374/78-02-07) brought to your attention in our letters
dated May 31 and June 26, 1978. We have no further questions regarding
this matter, and the records of the nonco=pliance have been corrected.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulaticns, a copy of this
letter and the enclosed inspection report will be placed in the
NRC's Public Document Room, except as follows. If this report
conta'if.s information that you cr your contractors believe to be
.
7 9 0 315 0 WO
.
.
~
Commonwealth Edison
-2-
- a
Company
proprietary, you must apply in writing to this ofrace, within twenty
days of your receipt of this letter, to withhold such information from
public disclosure. The application must include a full statement of the
reasons f or which the information is considered proprietary, and should
be prepared so that proprietary information identified in the application
is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this
inspection.
Sincere 3y,
e
,_, = )
.. F. Heishman, Chief
Reactor Ccnstruction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-373/78-32
and No. 50-374/78-23
cc w/ enc 1:
Mr. L, J. Burke, Site
Project Superintendent
R. J. Legner, Quality
Assurance Supervisor
Central Files
Reproduction Unit NRC 20b
P
L/.DR
Local PDR
. h' SIC
,'
e