ML19282B331

From kanterella
Jump to navigation Jump to search

"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.

Summary of 790205 Meeting to Discuss Submittal Plans of Const Permit Application Documents of Review Schedule.W/Encl Attendance List & Draft Event Schedule
ML19282B331
Person / Time
Issue date: 02/13/1979
From: Birkel R
Office of Nuclear Reactor Regulation
To:
COMMONWEALTH EDISON CO.
References
PROJECT-559A NUDOCS 7903130100
Download: ML19282B331 (5)


Text

.

h ( 'f UNITED STATES j

NUCLEAR REGULATORY COMMISSION

' 4 j I M(

j WASHINGTON,0. C. 20555 k

(m /

e FEB 131979 Project No.:

P-559 APPLICANT: Commonwealth Edison Company FACILITY:

Carroll County Nuclear Station, Units 1 & 2

SUBJECT:

SUMMARY

OF MEETING HELD ON FEBRUARY 5, 1979 A meeting was held with the applicant on February 5,1979 in Bethesda, Maryland to further discuss (reference Meeting Sunmary, dated January 18, 1979) plans for submittal of construction permit application documents and revier schedule for the Carroll County Nuclear Station.

Enclosure 1 presents a list of attendees.

The staff and applicant (with Westinghot% as NSSS vendor) continued its discussion of the review procedure and schedule which could reasonably be It was implemented for the Carroll County Nuclear Station application.

generally agreed that the review would consist of the following:

Early site review, including site suitability and some amount of 1.

site safety; 2.

A PDA review of the RESAR-412, based on a review of the differences J

between RESAR-414 and RESAR-412, plus a consideration of the R C Category 1-4 items as they apply to RESAR-412; 3.

An environmental review to pick up wherever the early site review leaves off; 4.

A CP review on the Carroll County docket of the custom B0P, utility-related matters, and remaining site safety items, and 5.

Upon completion of the RESAR-412 PDA review, Westinghouse would file an application for, and the staff would begin a 412 review leading to an FDA.

(It was further envisioned that Carroll County would reference the FDA at its OL stage.)

7903130lm

g u,w.

Commonwealth Edison Company gg 3 3 g Since it is contemplated that the staff review, in conjunction with the applicant activities, would attempt to use NUREG-0292 " Nuclear Power Opportunities for Improvement", procedures, it was Plant Licensing:

Enclosure difficult to develop an event schedule to perform such a review.

2 presents a draft event schedule which includes a review of RESAR-412 (PDA and FDA).

Further discussion with the applicant may be required, M

Ralph A, Birkel Light Water Reactors Branch No, 2 Division of Project Management

Enclosures:

As stated cc: Mr. Cordell Reed Assistant Vice President Commonwealth Edison Company One First National Plaza Chicago, Illinois 60690

f 4 131979 ENCLOSURE 1 ATTENDANCE LIST MEETING WITH COMMONWEALTH EDISON COMPANY February 5,1979 Commonwealth Edison Company W. F. Naughton C. Reed G. T. Klopp C. L. McDonough Westinghouse Electric Corp.

T. M. Anderson D. W. Call W. E. Kortier NRC - STAFF R. A. Birkel R. C. DeYoung R. Baer F. Schroeder D. B. Vassallo R. Mattson R. Boyd W. P. Gammill R. J. Goddard S. C. Goldberg C. Haupt G. LaRoche P. O'Reilly J. Heltemes t

~,

ENCLOSURE 2 erp 131979 DRAFT EVENT SCHEDULE CARROLL COUNTY NUCLEAR STATION, UNITS 1 & 2 DATE EVENT 12/78 ---

Early Site Review SSR tendered.

SRR docketed; review begins; notice of hearing on 2/79 Early Site Review Reviewers for Carroll County selected; pretendering 3/79 review regimen developed, reviewers advised of pre-tendering responsibilities, and schedule for review established.

Preliminary meeting between reviewers and applicant to 3/79 comunicate how pretendering review will be conducted.

Basic period of pretendering review 4/79 6/79 Westinghouse tenders RESAR-412 PDA application (includ-7/79 ing interface documentation that can be used for BOP review).

Docket RESAR-412; wrapup any outstanding matters involving 9/79 Carroll County pretendering review.

Applicant begins final preparation of B0P SAR and rest of 10/79 ---

Carroll County application taking into account results of pretendering review.

FES and Site Suitability Report developed for Early 12/79 ---

Site Review.

Applicant tenders Carroll County CP application (PSAR 1/80 ---

referencing RESAR-412 and ER); notice of hearing published (at tendering time rather than at docketing time); staff begins acceptance review for completeness and technical adequacy.

Start Early Site Review hearings.

2/80 Docket Carroll County PSAR; begin 6 month review to SER; 6/80 ASLB decision on Early Site Review.

Docket ER for CP review (Environmental review considers 8/80 only those matters not completed in Early Site Review and ASLB decision).

Draft Event Schedule Cont'd. FEB 131979 DATE EVENT RESAR-412 review completed, and SER published.

9/80 11/80 ---

ACRS meeting on RESAR-412.

12/80 ---

Carroll County SER published.

ACRS meeting on Carroll County; FES on Carroll County l

2/81 published. PDA on RESAR-412 issued.

Westinghouse tenders FDA application on RESAR-412.

3/81 4/81 ---

CP hearings on Carroll County begin.

10/81 ---

ASLB Partial Initial Decision relating to an LWA on Carroll County.

Initial Decision on CP application.

4/82 Targeted completion of RESAR-412 FDA review.

3/84 Targeted tendering date for Carroll County OL FSAR 4/85 referencing RESAR-412 FDA.

Applicant's projected fuel load date for Unit 1.

4/88 10/88 ---

Applicant's projected commercial operat'on date for Unit 1.

_-.