ML19282B308

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/78-21 & 50-330/78-21 on 781002-31.No Noncompliance Noted
ML19282B308
Person / Time
Site: Midland
Issue date: 02/01/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19282B310 List:
References
NUDOCS 7903130050
Download: ML19282B308 (2)


See also: IR 05000329/1978021

Text

.

kI

[* *"%,

uNiTr0 STATES

2

f,

9.".

'

NUCLE AR REGtJL ATOR Y COMMISSf M.

3, .g . .; ,j

nEciou m

, e

7 n e. c . srerirnotn

Jie

k , * .I ,

c,t e r. w. v N u w ,6o137

1

,,

....-

Docket No. 50-329

Docket No. 50-330

Consumers Power. Company

ATTN:

Mr. Stephen H. '4lowell

Vice President

1945 WestiParnall Road

Jackson, MI 49201

Gentlemen:

This refe.rs to the inspection conducted by Mr. R. J. ' Cook of'th'is

of_fice during the period of October 2-31, 1978,~of ac'tivities.at

the Midland Nucicar Tower Plant construction site,' Units 1 snd 2,

authorized by NRC Construction Permits No CPPR-81 and No3_CPPR282

and to the discussion of our findings with Massrs, b. B. Miller,

J.

L,. Corley and others of your staf f weekly dui-ing the inspection

and at the . conclusion of the inspection,

The enclosed copy of our inspection report identifies hr'eas

gxamined during the inspection. Within these areas, the.

inspection consisted of a selective examinstion of procedtires

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of tiliis

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as f ollows. If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within'

twenty days of your receipt of this letter, to withhold such

information frem public disclosure. The application must include'

a full statement of the reasons for which

t..s

information is con-

sider.cd proprietary, and should be prepared so that proprietary

information identified ~in the application is contained in an

e_nclosure to the application.

790313005o

.

s'

s

.

Consumers Power Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

Q

g

/

R, F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-329/78-21

and No. 50-330/78-21

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

/ TIC

Ronald Callen, Michigan Public

Service Commission

Dr. Wayne E. North

Myron M. Cherry, Chicago