Text
.
APPENDIX A NOTICE OF VIOLATION Duquesne Light Company Docket No. 50-334 Based on the results of an NRC inspection conducted December 18-20, 1978, it appears that one of your activities was not conducted in full compliance with the conditions of your NRC License No. DPR-66 as dis-cussed below.
This item is an infraction.
Technical Specification 6.8.1 requires, in part, " Written proce-dures shall be established, implemented and maintained covering the activities referenced below:
- a. The applicable procedures recommended in Appendix 'A' of Regulatory Guide 1.33, November 1972...."
Appendix A of Regulatory Guide 1.33 recommends that procedures for
".. 4. Procedure Adherence and Temporary Change Method..." be established.
The Beaver Valley Power Station Operating Manual, (BVPS OM), Chapter 48, Section 1.48.E, " Review, Revision and Approval of Procedures",
provides for revising Operating Procedures by way of an Operating Manual Change Notice (OMCN) which is to be inserted in the aopropriate chapter of the controlled Operating Manuals in the control room.
The BVPS OM, Chapter 48, Section 1.48.G, " Adherence to Operating Procedures", states, in part, " Operating procedures are written to cover a reasonable number of normal, abnormal, emergency, and casualty operations..." and "...The potential consequences of in-correct action, and the inherent complexity of the plant make it imperative that written, carefully reviewed, and approved procedures are used for operation of the plant, except where emergencies or casualties require immediate action...."
Operating Surveillance Test OST 1.36.2, Diesel Generation No. 2 Monthly Test, Revision 10, was revised on October 30,1978 by Operating Manual Change Notice (OMCN) No.78-206.
This OMCN required, in part, that the Field Flash Cutout Relay Temporary Monitoring Circuit be observed for proper relay contact position to ensure reliable nenerator field flash capability for automatic diesel generator starts.
Contrary to the above OST 1.36.2, Revision 10, was performed on s
December 1 and 4, 1978, withaut having OMCN 78-206 properly in-corporated in the procedure copies used to perform the test and without having documented the performance of the actions required by the OMCN.