ML19282A812

From kanterella
Jump to navigation Jump to search
Responds to NRC 790103 Ltr Re Violations Noted in IE Insp Rept 50-285/78-18.Corrective Actions:Annual Operator Examinations Conducted in Jan & Feb 1978
ML19282A812
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/23/1979
From: Short T
OMAHA PUBLIC POWER DISTRICT
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19282A810 List:
References
NUDOCS 7903070051
Download: ML19282A812 (1)


Text

'

5 ,

Omaha Public Power District -

1623 HARTdEy a OMAHA. NEBRASKA 68102 8 TELEPHONE 536 4000 AREA CODE 402 January 23, 1979 FC-138-79 Mr. Glen L. Madsen U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Dear Mr. Madsen:

Reference:

Inspection Report 50-285/78-18 Dated January 3, 1979 In reply to the referenced inspection report, the Omaha Public Power District submits the following to indicate the status of the reported deviation.

Deviation Section I.1 of your NRC approved Licensed Operator Requalification Program (revised May 13, 1974) requires that an annual written examina-tion be conducted and that, following the examination, a report be issued summarizing weak topical areas.

Indeviationfromt51eabove,nosummaryreportwasissuedfollowing the 1977 annual examination which was conducted in January and February, 1978.

Response

(1) Corrective steps which have been taken and results achieved.

The annual examination results were tabulated when the examinations were graded early in 1978. Review by the Training Coordinator and Operations Supervisor found no weak topical areas. A report summariz-ing their findings has been issued.

(2) Date when full compliance vill be achieved.

The Omaha Public Power District is presently in full compliance.