GM Carolina Power & Light Company February 1, 1979 e r. '
L. a
- g ((; b FILE
- NG-3513(B)
SERIAL: GD-79-260 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 & 2 LICENSE NO. DPR-71 AND DPR-62 DOCKET NO. 50-325 AND 50-324 RESPONSE TO IE BULLETIN 78-14
Dear Mr. O'Reilly:
In response to your letter of December 18, 1978, transmitting IE Bulletin 78-14, Carolina Power & Light Company is submitting the following information.
Three items regarding the deterioration of Buna-N components in ASCO solenoid valves were expressed in IE Bulletin 78-14.
Item 1 The seven year recommended life for presently in-service CRD Buna-N materials was investigated. Buna-N pressure and exhaust diaphragms (including body gaskets), referenced in SIL-128, were replaced during Fall, 1976, for Unit No. I and during March, 1976, for Unit No. 2.
Additional Buna-N valve components mentioned in SIL-128, Revision 1, Supplement 1, have not been replaced.
The following valves were shipped to Unit No. I during June, 1971, and to Unit No. 2 during March,1971.
7903050513 7986/9
-wjf, r. -
' OFFICIAL CO,r.
m,.m. s e.
~ c tw.
w..,,,, <,.. m.... r o o
. ~.,
w~
February 2,1979 2
~
'Mr. James P. O'Reilly Quantity In Use Per Unit Valve Name 274 HCU Scram Pilot Valve 2
Backup Scram Valve Scram Discharge Volume Vent &
2 Drain Pilot Valve Scram Discharge Volume Vent &
1 Drain Test Valve Packaging dates for the above components could not be determined.
Item 2 A schedule for replacement of all the Buna-N components addressed in SIL-128, Revision 1, Supplement 1, was developed.
Pressure and exhaust diaphrages and body gasket replacement one-third of the scram pilot valves are parts for at least Therefore, one-third of the scram pilot presently in stock. rebuilt using these parts during the 1979 Unit valves will be The remaining two,hirds No. I and Nd. 2 refueling outages.
scram pilot valves will be rebuilt during the 1980 refueling outages.
All the scram discharge vent and drain pilot valves, backup scram scram discharge volume vent and drain test valves, and the scram pilot valve head components will be rebuilt during the
- valves, 1980 refueling outages since these replacement parts are not in stock.
These replacement parts have been ordered and :re expected to be delivered before the 1980 refueling outages.
Should sufficient replacement parts arrive before March 1,1979, C?rolina Power & Light Company will replace as many of the Buna-N components as possible during the present refueling outages.
Item 3 1979, CP&L received additional information from On January 30, schedule General Electric concerning the periodic replacement We have not yet had the opportunity needed for these components. and therefore we are requesting an to study this information, We will extension of time for this portion of the response.
provide you with our schedule for periodic replacement of Buna-N material by March 2,1979.
w
3 February 2, 1979
, Mr. James P. O'Reilly We trust that this information satisfies the requests of IE Bulletin 78-14.
Yours very truly, q
E. E. Utley Senior Vice President Power Supply DCS: men
- cc:
Mr. John G. Davis Mr. Norman C. Moseley E
.