ML19282A596

From kanterella
Jump to navigation Jump to search
Confirms 790201 Telcon Re Reassignment of Region II Cadres
ML19282A596
Person / Time
Site: Harris  
Issue date: 02/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Reis E
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML19282A595 List:
References
REF-SSINS-4220 NUDOCS 7903050128
Download: ML19282A596 (1)


Text

  1. Ricrq UNIT ED STATES o

NUCLEAR REGULATORY COMMISSION

["I n

REGION H 101 M ARIETT A STREET, NXJ.

5 o

8 ATLANTA, GEORGIA 30303 FEB 21979 SSINS 4220 MEMORRIDUM FOR: Edwin J. Reis, OELD FROM:

Charles E. Murphy, Chief Reactor Construction and Engineering Support Branch

SUBJECT:

PERSONNEL CHANGES IN REGION Il This is to confirm our telecon of February 1, 1979, relating to the reassignment of personnel in Region II. These changes are as follows:

1.

D. T. Thompson, formely Deputy Director, Region II has been transferred to IE:HQ where he will be Executive Officer for Operations Support.

2.

F. J. Long, has been appointed Acting Deputy Lirector.

3.

R. C. Lewis, has been appointed Acting Chief, Reactor Operations and Nuclear Support Branch.

4.

F. S. Cantrell has been appointed Acting Chief, Reactor Projects Section No. 2.

5.

V. L. Brownlee has been transferred to the Reactor Operations and Nuclear Support Branch.

6.

R. D. Bradley has been assigned to the position of Principal Inspector.

Changes 1 is a permanent change. Changes 2,3, and 4 are temporary until the selection of Deputy Director is made. Change 5 is expected to last approximately one year during which time Brownlee will serve on a special Quality Assurance task force. At the end of that assignment Brownlee will be reassigned to the RC&ESB. Change 6 will remain in effect indefinitely until the Principal Inspector assignment 3are rotated.

/}

s-f Charles E. hurphy,Mh'i'ef Reactor Construction and Engineering Support Branch cc: Ed Jordan, IE:llQ M4 3 05 0 /2.S-

-.