Forwards IE Insp Rept 70-1113/79-03 on 790205-09.No Noncompliance Noted
ML19281B134
Person / Time
Site: 07001113
Issue date: 03/21/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Alkema R
GENERAL ELECTRIC CO.
Shared Package
ML19281B132 List:
References
NUDOCS 7904260044
Download: ML19281B134 (2)


Text

pn R200 UNITED STATES NUCLEAR REGULATORY COMMISSION 8

o,'o

+

REGloN ll 5

101 MARIETTA STREET,N.W.

r ATLANTA, GEORGIA 30303 4

% **v /

MAR 211979 In Reply Refer To:

RII:DJP 70-1113/79-03 General Electric Company ATTN:

Mr. R. J. Alkema, General Manager Wilmington Manufacturing Department P. O. Box 780 Wilmington, North Carolina 28401 Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this office on February 5-9, 1979, of activities authorized by NRC License No. SNM-1097 for the General Electric facility, and to the discussion of our findings held with J. E. Bergman at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified enforcement matters and unresolved items.

The status of these items is discussed in the enclosed report.

Three (3) new unresolved items resulted from this inspection and are discussed in the enclosed report.

These items will be examined during subsequent inspections.

In accordance with Se: tion 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in

~ his regard within the specified period, the report will be placed in the t

Public Document Room.

7904260O W

MAR 211979 General Electric Company Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, Afk l

E

/

ack T. Sutherland, Chief Fuel Facility and Materials Safety Branch

Enclosure:

Inspection Report No. 70-1113/79-03 cc w/ encl:

Mr. A. L. Kaplan, Manager Licensing and Compliance Audits General Electric Company Mail Code J-26 P. O. Box 780 Wilmington, North Carolina 28401 Mr. C. M. Vaughan, Manager Nuclear Materials Management Mail Code K-88 P. O. Box 780 Wilmington, North Carolina 28401

,