ML19281A392

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/79-03 on 790123-26.No Noncompliance Noted
ML19281A392
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/22/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19281A388 List:
References
NUDOCS 7903130154
Download: ML19281A392 (2)


See also: IR 05000348/1979003

Text

e

  • \\

.

,

  1. ga aro

u

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

i

g

[

REGloN 11

o

5

,$

101 MARIETTA STRE ET. N.W.

o

ATLANTA, GECRGIA 30303

' ' ' . . . . . + '

FEB 2 219/9

In Reply Refer To:

RII:AKH

50-348/79-03

Alabama Power Ccmpany

Attn:

Mr. F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, Alabama

35291

Gentlemen:

This refers to the inspection conducted by Mr. A. K. Hardin of this office on

January 23-26, 1979, of activities authorized by NRC License No. NPF-2 for

the Farley Unit 1 facility, and to the discussion of our findings held with

Mr. W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of nonce,mpliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

,

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

i

!

7903J30f5y

.;

-

.

FEB 2 21379

.

Alabama Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

E.c.

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report No. 50-348/79-03

cc w/ encl:

Mr. W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, Alabama

36312

Mr. A. R. Barton

Executive Vice Pesident

Alabama Power Company

Post Office Box 2641

Bi rmingham, Alabama 35291

Mr. H. O. Thrash

Manager-Nuclear Generation

Alabama Power Company

Post Office Box 2641

Birmingham, Alabama 35291

Mr. C. Biddinger, Jr.

Manager-Corporate Quality Assurance

Alabama Power Company

Post Office Box 2641

Birmingham, Alabama 35291

Mr. R. E. Hollands, Jr.

Quality Assurance Supervisor

Farley Nuclear Plant

Post Office Box U

Ashford, Alabama 36312

,