ML19281A066

From kanterella
Jump to navigation Jump to search
Forwards WARD-D-0169, Clinch River Breeder Reactor Plant, Response of Plant to Postulated Loss of One Heat Transport Loop W/Failure of Both Reactor Shutdown Sys.
Date released: 10/22/2019 Download: ML19281A066


WARD-D-0169, Clinch River Breeder Reactor Plant,Response of Plant to Postulated Loss of One Heat Transport Loop W/ Failure of Both Reactor Shutdown Sys. Addresses Anticipated Event Causing Most Severe Loss of Heat Removal
ML19281A067
Person / Time
Site: Clinch River
Issue date: 02/28/1977
From: Markowski F, Mccall T
EMVWE, WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
References
Download: ML19281A067 (25)
Forwards WARD-D-0169, Clinch River Breeder Reactor Plant, Response of Plant to Postulated Loss of One Heat Transport Loop W/Failure of Both Reactor Shutdown Sys.
ML19281A064
Person / Time
Site: Clinch River
Issue date: 02/16/1979
From: Copeland R
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT
To: BOYD R S
Office of Nuclear Reactor Regulation
References
Download: ML19281A064 (2)