ML19280A849
| ML19280A849 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/22/1980 |
| From: | Jay Collins Office of Nuclear Reactor Regulation |
| To: | Arnold R METROPOLITAN EDISON CO. |
| References | |
| CON-NRC-TMI-80-126 NUDOCS 8009120677 | |
| Download: ML19280A849 (6) | |
Text
'
Distribution:
DN 50-320 NRC PDR AUG 2 21980 Local POR
- TERA 3c)
TMI Site r/f-NRC/TMI-80,16 TMI Program Office HQ r/f J. Collins Docket No.
50-320 A. Fasano E
R. Conte ELD' Mr. R. C. Arnold IE (3)
Senior Vice President M. Duncan ~
a Metropolitan Edison Company J. R. Buchanan, NSIC '
100 Interpace Parkway ACRS (16)
Parsippany, New Jersey 070S4 B. J. Snyder
~
' ~ " '
Dear !!r. k nold:
~
Subject:
EPICOR II Resin Solf dification Test Program i
Reference:
G. K. Ilovey letter to J. T. Collins, TLL-241, dated June 5,1980 We have reviewed the material presented in the referenced letter, and o~ur cornents/ questions are attached. We realize that your submittal is for information and preliminary in nature. However, the attached conments and questions will convey some of our early concerns and should aid in the development of an acceptable solidified resin product.
/
Original signed by
^
t.
J ohn T. Collin9 John T. Collins c.
Deputy Program Director THI Program Office
Attachment:
As stated cc: See Service Distribution List s.
([77
.JIQf linstws._.g.g.g s-t *
.612lLS.0 o^ ' c ~
P.. C. Arnold Metropolitan Edison Company Mr. G. K. Hovey J. B. Lieberman, Esquire Director, TMI-2 Berlock, Israel, Lieberman Metropolitan Edison Company 26 Broadway P. O. Box 480 New York, NY 10004 Middletown, PA 17057 George F. Trowbridge, Esquire Mr. J. J. Barton Shaw, Pittman, Potts & Trowbridge Manager, Site Operations, TMI-2 1800 M Street, N.W.
Metropolitan Edison Company Washington, DC 20036 P. O. Box 480 Middletown, PA 17057 Ms. Mary V. Southard, Chairperson Citizens for a Safe Environment Mr. R. W. Heward P. O. Box 405 Radiological Control Manager, TMI-2 Harrisburg, PA 17108 Metropolitan Edison Company P. O. Box 480 Dr. Walter H. Jordan Middletown, PA 17057 881 W. Outer Driva Oak Ridge, TN 3782 Mr. B. Elam Manager, Plant Engineering Dr. Linda W. Little Metropolitan Edison Company 5000 Hermitage Drive P. O. Box 480 Raleigh, NC 27612 Middletown, PA 17057 Karin E. Carter, Esquire Mr. R. F. Wilson 505 Executive House Director, Technical Functions P. O. Box 2357 Metropolitan Edison Company Harrisburg, PA 17120 P.O. Box 480 Middletown, PA 17057 Honorable flark Cohen 512 E-3 Main Capital Building Mr. L. W. Harding Harrisburg, PA 17120 Supervisor of Licensing Metropolitan Edison Company Ellyn Weiss, Esquire P. O. Box 480 Sheldon, Harmon, Roisman & Weiss Middletown, PA 17057 1725 I street, N.W., Suite 506 Washington, DC 20006 Mr. E. G. Wallace Licensing Manager Mr. Steven C. Sholly GPU Service Corporation 304 S. Market Street 100 Interpace Parkway Mechanicsburg, PA 17055 Parsippany, NJ 07054 Mr. Thomas Gerusky Mr. I. R. Finfrock, Jr.
Bureau of Radiation Protection Jersey Central Power & Light Company P. O. Box 2063 Madison Avenue at Punch Bowl Road Harrisburg, PA 17120 Morristown, NJ 07950 Mr. Marvin I. Lewis Mr. R. W. Conrad 6504 Bradford Terrace Pennsylvania Electric Company Philadelphia, PA 19149 1007 Broad Street Johnstown, PA 15907 Ms. Jane Lee R. D. 3, Box 3521 Etters, PA 17319
$1r. R. C. Arnold lietropolitan Edison Company Walter W. Cohen, Consumer Advocate Ms. Kathy McCaughin Department of Justice Three liile Island Alert, Inc.
Strawberry Square,14th Floor 23 South 21st Street liarrisburg, PA 17127 Itarrisburg, PA 17104 Robert L. Knupp, Esquire Ms. Mar iorie H. Aamoc t Assistant Solicitor R. D. #5 Knupp and Andrews Coatesville, PA 19320 P. O. Box P 407 N. Front Street lis. Karen Sheldon Harrisburg, PA 17108 Sheldon, Harmon', Roisman & Weiss 1725 I Street, N.W., Suite 506 John E. Minnich, Chairperson 1lashington, DC 20006 Dauphin Co. Board of Commissioners Dauphin County Courthouse Earl B. Hof fman front and Market Streets Dauphin County Commissioner Ilarrisburg, PA 17101 Dauphin County Courthouse Front and flarket Street Robert Q. Pollard liarrisburg, PA 17101 Chesapeak Energy Alliance 609 Montpelier Street Government Publications Section Baltimore, MD 21218 State of Library of Pennsylvania Box 1601 Education Building Chauncey Kepford Harrisburg, PA 17127 Judith H. Johnsrud Environmental Coalition on Nuclear Power Dr. Edward O. Swartz 433 Orlando Avenue Board of Supervisors State College, PA 16801 Londonderry Township RFD #1 Geyers Church Road Ms. Frieda Berryhill, Chairperson 11iddletown, PA 17057 Coalition for Nuclear Power Plant Postponement U. S. Environmental Protection Agency 2610 Grendon Drive Region III Office Wilmington, DE 19808 ATTN:
EIS COORDINATOR Curtis Building (Sixth Floor)
Holly S. Keck 6th and Walnut. Streets Anti-Nuclear Group Representing,Y,ork Philadelphia, PA 19106 245 W. Philadelphia Street York, PA 174J4 Dauphin County Office Emergency Preparedness John Levin, Esquire Court House, Room 7 Pennsylvania Public Utilities Conmission front and Itarket Streets P. O. Box 3265 liarrisburg, PA 17101 Itarrisburg, PA 17120 Department of Enviornmental Resources Jordon D. Cunningham, Esquire ATIN:
Director, Office of Fox, Farr and Cunningham Radiological Health 2320 N. Second Street P. O. Box 2063 Harrisburg, PA 17110 Harrisburg, PA 17105
Mr. R. C. Arnold Metropolitan Edison Company Governor's Office of State, Planning and Development ATTN: Coordinator, Pennsylvania Clearinghouse P. O. Box 1323 liarrisburg, PA 17120 Mrs. Rhoda D. Carr 1402 Marene Drive Harrisburg, PA 17109 Mr. Richard Roberts The Patriot 812 Market Street liarrisburg, PA 17105 Mr. Robert B. Borsum Babcock a Wilcox Huclear Power Generation Division Suite,420, 7735 Old Georgetown Road Bethesda, MD 20014 Ivan W. Smith, Esquire Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, DC 20555 Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, DC 20555 Atomic Safety and Licensing Appeal Panel U. S. Nuclear Regulatory Commission
-Washington, DC 20555 Docketing and Service Section U. S. Nuclear Regulatory Commission Washington, DC 20555 O
5
EPICOR II RESIN SOLIDIFICATION TEST PROGRAM COMMENTS / QUESTIONS 1.
How will you ascertain whether the resins used in the test program are representative of the resins.
2.
How will compression and tensile test date be used to characterize the solidified waste product.
- 3. of the referenced letter, TLL-241, states that a few full sized liners will be solidified as part of the demonstration.
110 wever, the Hittman test program addresses the full scale testing in terms of 30 gallon drums. Tests should be performed using container sizes and designs which will be actually used in the EPICOR II resin solidification system.
- 4., page 3; paragraph 2.
NRC Standard Review Plan 11-4, ETSB Branch Technical Position No. 11-3 states that uniform distribution is required.
This is interpreted to mean evenly distributed resin. Without criteria for resin homogeneity, test samples may not be representative of the full scale product.
Leachability, compression and tensile strength, and hardness may vary as the location of resin concentrations change.
- 5. ; Section ivc; pages 6-7 Identify the method used to verify that the desired resin depletion levels are achieved.
- 6. ; Section IVD; last paragraph; page 7 The sample cure time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> has been changed to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
The cure time should be respecified.
- 7. ; Section IVE; item 7, page 9 An electric mixer is used rather than a spatula.
- 8. ; Section IVE, item 12, page 10 See specific coment 6.
- 9. ; Section VB; item 4; page 16 See specific comment 6.
/
/
2
- 10. Attachment 3; Section VG, page 18 There will be no samples which have been inmersed 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after molding. This section should respecify when immersed samples will be compression tested.
- 11. Attachment 3; Section VH; page 18 See specific comment 12.
- 12. ;Section VI,1st paragraph; page 23 The quantities of the contaminants to be added to the resins in the special tests should be identified and the basis for assuming that this will represent conditions in the EPICOR II liners generated to date should be explained.
In addition, the tests under which the special samples will be subjected should be identified.
- 13. ; page 15, Observation Criteria, item 2 Probing with stirring rods is not an appropriate means to determine cement hardness.