r JAFNPP I & C DEPT.

POWER AUTIIORITY OF THE STATE OF NEW YORK l JAMES A. FITZPATRICK NUCLEAR POWER PLANT INSTRUMENT SURVEILLANCE PROCEDURE

/

TITLE: SCRAM DISCHARGE VOLUME HIGH WATER PROCEDURE NO. F-ISP-66-1 LEVEL INSTRUMENT FUNCTIONAL TEST / CALIBRATION

  • REVIEWED BY: Plant Operations Review Committee Meeting No.80-055 Date 7/24/80 APPROVED BY:
  • b Resident Manager kv E19 Date $f$fTC APPROVED BY: [. d hd h m, ON v1 Date 1!'30f ?0 In,s}rumentationGCo,ntrol Superintendent Page No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Rev. 4 4 4 4 4 4 4 4 4 4 4 4 4 Page No. 14 15 Rev. 4 4 Page No.

Rev.

Page No.

Rev.

Page .o.

Rev.

Page No.

Rev.

Page No.

Rev.

Rev. No. 4 ,

Date July 1980 Page 1 of 15 8008130 f2.7 /

THIS DOCUMENT CONTAINS POOR QUAUTY PAGES

. 4, e

POWER AUTHORITY OF THE STATE OF NEN YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT INSTRUMENT SURVEILLANCE PRCCEDURE TITLE: SCRAM DISCHARGE VOLUME HIGH WATER PROCEDURE NO. F-ISP-66-1 LEVEL INSTRUMENT FUNCTIONAL TEST / CALIBRATION

  • 1.0 PURPOSE 1.1 The purpose of this procedure is to demonstrate the operability of the Scram Discharge Volume High Nater Level instrument channels of the Reactor Protection System (RPS). In accordance 4 with the surveillance requirements of the JAFNPP Technical Specification, Tables 4.1-1, and 4.1-2, this includes a quarterly functional test and quarterly calibration.

2.0 REFERENCES

2.1 Elementary Drawing 791E456, RPS, Sheets 1 through 15 2.2 PSID 729E222BA, RPS, Sheets 1 through 3 2.3 Technical Specification, and Tables 3.1-1, 4.1-1 and 4.1-2 2.4 Magnetrol, MODEL 5.0-751-0.75-1X-hPG-M13HY 2.5 Administrative Procedure, AP-4.1 3.0 PREREQUISITES 3.1 This procedure may be performed at any plant power level.

3.2 There are six instruments to be tested / calibrated as part of this procedure. The instructions of Section 5.0 a_e to be performed for each instrument and the Checklist / Data Sheets completed.

3.3 Establish communications between the local rack and the Control Room.

3.4 The following Precautions must be observed:

3.4.1 When an instrument channel in one trip system is being tested, 4 all instrument channels in the other trip system must be Rev. No. 4 Date July 1980 Page 2 of 15 ,

a POWER AUT110RITY OF THE STATE OF NEW YORK JAFES A. FITZPATRICK NUCLEAR POWER PLANT INSTRUTENT SURVEILLANCE PROCEDURE TITLE: SCRAh! DISCHARGE VOLUSE HIGH WATER PROCEDURE 1 '. F-ISP-66-1 LEVEL INSTRU5ENT FUNCTIONAL TEST / CALIBRATION

  • operable and untripped to preclude an unwarranted single channel trip.

3.4.2 When i.solating or restoring an instrument channel, close or open the valves slowly to avoid the formation of a pressure surge and inadvertent trip of a redundant channel.

3.4.3 All steps of this procedure are to be performed in sequence.

Only one instrument channel is to be tested / calibrated at a 4 time.

3.4.4 The Shift Supervisor must be notified immediately whenever an instrument is out of tolerance, this procedure cannot be performed as written or the instrument is not functioning as required.

3.4.5 Personnel performing this procedure have read it in its entirety and have become thoroughly familiar with its contents.

4.0 TEST EQUIPMENT .

4.1 Installed test equipment S.0 PROCEDURE The Checklist / Data Sheets must be completed as each step and/or substep is completed.

5.1 Contact the Shift Supex <isor and obtain permission to perform the procedure.

S.2 Verify that the installed test equipment is operable.

CAUTION Observe Precaution 3.5.1 prior to placing the Reactor pro-tection System in single channel trip condition.

Rev. No. 4 Date July 1980 Page 3 of 15 ,

_ - ~

4 POWER AUDIORITY OF THE STATE OF NEW YORK JAFES A. FITZPATRICK NUCLEAR POWER PLANT INSTRISENT SURVEILLANCE PROCEDURE TITLE: SCRAM DISCHARGE VOLtBE HIGH WATER PROCELURE NO. F-ISP-66-1 LEVEL INSTRIBENT FUNCTIONAL TEST / CALIBRATION

a. 1-1 Discharge Volume High Water Level Trip.
b. 1-11 Discharge Volume High Water Level Trip Bypass.
c. 1-3 Reactor Auto Scram Trip System A.
d. 1-4 Reactor Auto Scram Trip System B.

CAUTION Observe Precaution 3.5.2 prior to isolating the instrument for the channel under test.

5.4 Verify that the main drain valve is open.

5.5 Isolate the switch under test by breaking the seals and slowly 4 closing the high and low isolation vals os.

5.6 Open the vent and drain valves for the switch under test.

NOTE A. Testing Level Switen 3-LS-231A, will cause Level Switch 3-LS-231F to actuate at 3 + 1 gallons, resulting in an alarm annunciator 9.5.1.44 Record on the Checklist / Data Sheets that the annunciator came in.

B. Testing Level Switch 3-LS-231D, will cause Level Switch 3-LS-231E to actuate at 18 + 1 gallons, resulting in a rod withdrawal block and a computer printout. Record on the Checklist / Data Sheets that the rod block annunciator 9.5.2.2 and computer point (A510) are in alarm condition.

5.7 Slowly introduce deminerali:ed water into the water level gauge until the trip point of the level switch under test is reached as indicated by the Discharge Volume High Water Level Trip Annunciator 1-1 in a tripped condition. Record the trip point value on the Checklist / Data Sheet.

Rev. No. 4 Date Julv 198a Page 4 of 15 .

~.

POWER AU'I110RITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT INSTRU'IENT SURVEILLANCE PROCEDURE TITLE: SCRAM DISCHARGE VOLU!E HIGH WATER PROCEDURE NO. F-ISP-66-1 LEVEL INSTRUFENT FUNCTIONAL TEST / CALIBRATION

  • The Acceptable Trip Point is < 36 gallons.

As a guide, the technician should attempt to maintain a lower value of 35.5 gallons.

NOTE If the above trip point cannot be verified, trip point calibra, tion is required (Refer to Step 5.11). If within allowable limits, perform Steps 5.8 *.hrough 5.10, then proceed to Step 5.12.

5.8 On the completion of Step 5.7, verify the following for the instrument under test.

a. Annunciator 1-1 Discharge Volume High Water Level Trip in a tripped condition.
b. Computer printout generated.
c. Primary relay actuated. (May be verified by a. and b.

above) .

SWITCH PRIMARY LOCATION COMPUTER RELAY PRINTOUT 3-231A 5A-K1A 9-15 D500 3-231B SA-K1B 9-17 D501 3-231C 5A-KlC 9-15 D502 3-231D SA-K1D 9-17 D503 5.9 At Panel 9-5, verify the following.

a. Appropriate Reactor Auto Scram Trip annunciator (1-3 or 1-4) in a tripped condition.
b. Channel scram solenoid valve indicating lights 0FF.

5.10 Using the main drain valve, slowly remove water from the water level gauge until the reset point for the level switch under test is reached as indicated by the Discharge Volume High Water Level Trip anm ,ciator in a nontripped condition, reset Rev. No. 4 Date July 1980 Page 5 of 15 _

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FIT: PATRICK NUCLEAR POWER PLANT INSTRUMENT , SURVEILLANCE PROCEDURE TITLd: SCRAM DISCHARGE VOLUME HIGH WATER PROCEDURE NO. F-ISP-66-1 LEVEL INSTRUMENT FUNCTIONAL TEST / CALIBRATION

  • the single channel trip at Panel 9-05 by positioning the Scram Reset switch to Groups 15 4 and Groups 2 S 3 then to NORM, and then verify the following.
a. Annunciator 1-1 Discharge Volume High Water Level Trip in a nontripped condition.
h. Computer printout reset
c. Primary relay reset (may be verified by a. and b. above) .
d. Appropriate Reaccor Auto Scram Trip annunciator (1-3 or 1-4) in a nontripped condition.
e. Channel scram solenoid valve indicating lights ON.

5.11 If required (see Steps 1.1 and 5.7), calibrate the level switch under test as follows. Observe Precaution 3.5.3.

5.11.1 Adjust the water level in the water column to the trip point value, then adjust the level switch for < 35.5 gallons.

5.11.2 Decrease the level and verify that the switch resets. Record the reset point on the Checklist / Data Sheet.

5.11.3 Repeat Steps 5.7 through 5.10 on the completion of th. calibra-tion and note any difference in switch actuation.

5.11.4 Continue to drain all water from the switch under test / calibration.

CAUTION Observe Precaution 3.5.2 prior to restoring the instrument for the channel under test.

5.12 Completely drain all water from the water column and level switch, close and seal the vent and drain valves.

5.13 Slowly open the high and low tap isolation valves and then seal the valves.

5.14 Verify that the single channel trip condition is reset at Panel 9-05. Verify the return to operability of the level Rev. No. 4 Date July 1980 Page 6 of 15 -

4 POWER AU'IMORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLXfr INSTRUMENT SURVEILLASCE PRCCEDURE TITLE: SCRAM DISCHARGE VOLUME HIGH WATER PROCEDURE NO. F-ISP-66-1 LEVEL INSTRUMENT FUNCTIONAL TEST / CALIBRATION

  • switch under test by observing the Discharge Volume High Water Level Trip Annunciator 1-1 in a nontripped condition, and notify the Control Room Operator of completion of the test /-

calibration.

5.15 Complete an Occurrence Report for any reportable problems encountered during the test / calibration and corrective action taken. For each problem specify whether followup action is required. This form is to be submitted to the Shift Supervisor on duty.

5.16 Repeat Steps 5.1 through S.15 for the remaining instrument channels.

6.0 ACCEPTANCE CAITERIA The surveillance r2quirements will have been satisfied when the following items have been completed and signed off.

6.1 The procedures of Section S.0 are completed for each channel.

3-231A 3-231C 3-231B 3-231D 6.2 The Checklist / Data Sheets have been completed, reviewed and submitted for signature to the Instrumentation and Control Superintendent or designated alternate for each of the above channels.

6.3 An Occurrence Report has been initiated as required for any reportable problems encountered during the procedure. All necessary corrective action has been completed and the instru-ment channels restored to service.

Rev. No. 4 Date July 1980 Page 7 of 15

O

_~

t

/  %.

is t

4 Q

/m ' . , - /

,7 en. . A

. '/ '

\ + ./

y ,

-i -

4 O

oo

.4

. 40 1 ,

$[ ..

g d -

' ./ .

\ ~

g

/

/ & L M

y D

1

\

s

/

d' f4 t

s

\N \

y s

s

\ -

p i '

\ s

_.,_,s

?\ i 0 k /

s

\

I h

-9' g'

._ f s , ...

Y1 g

x

/

, c, .

'y

.n s

  • ' n f.?

's I , I,I Le( f if iii  !*

,  !! ,Y vr ;., , n

,d. ~ '

=b O V vr u, U

% , se h .1 t'

. A (D

su ,

t 5

i ._ _ . . . . . . . . . . .

et - -9 n

, ~; \ ',, C

.., .s

- \ g$

7 -

  • ,y 4 I

a r,-

fa

  • i v

1,. .

c

/ / \

[ ',

f  !

..o / ,5

  • p' 0 O

4, t.

f' [L

/

  • C

/

?

.s .. ,/ ,

')

/ 'I

/

/

/

C. _

0 4 5

  1. ' y ^r;c O

.?

! s.

i n

.s M/

ra

\ -$

\

\ .2

.s \

s z

'm \

'l C,

e d

fD

/?

g o t,e ,

. i t s t.

,4,-_{* ,-,,

/ i3? 6.

/

t il . tl ',

{ . ./ /, -

lc s.' 'n o e)- {UV O

r,) L, t, o 3 s'-

_g

^

. O O

ni k- - . ._

OCUV, ,-

l_

man.

1 I E

n ROO%l30 lob 7 NO. OF PAGES I Pn 4 REASON-O PAGE ILLEGIBLE:

PDR CF O HARD COPY FILED AT.

DTHER

/ 1 O BETTER COPV REQUESTED ON

@ AGE TOO LARGE TO FILM.

O HARD COPV FILED AT:

PDR h OTHER MLMED ON APERTURE CARD NO. TodT13o627