Forwards IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Action Required
ML19276H501
Person / Time
Site: South Texas  
Issue date: 11/08/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 7911290030
Download: ML19276H501 (1)


Text

h h/[

g UNITED STATES g>* " 8 coq'o, NUCLEAR REGULATORY COMMISSION

.?

REGICN IV

^

f

/*b.

/r 611 RY AN PLAZA ORIVE. SulTE 1000 3,, k,g$4d 2

0 ARLINGTON, TEX AS 76012 r..;u;34/p[

q H'/ -

c,,

8 November 3, 1979 S,,

In Reply Refer To:

RIV Docket Nos. 50-498/IE Bulletin No. 79-02, Revision 2 50-499/IE Sulletin No. 79-02, Revision 2 Houston Lighting & Power Company ATTN:

Mr. E. A. Turner, Vice President Power Plant Construction and Technical Services Post Office Box 1700 Houston, Texas 77001 Gentlemen:

Enclosed is IE Eulletin No. 79-02, Revision No. 2 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.

Should you have any questions regarding this Bulletin Revision or the actions required by you, please contact this office.

Sincerely, L*

Karl V. Seyfrit Director

Enclosures:

1.

IE Eulletin No. 79-02, Revision No. 2 2.

List of IE Bulletins Issued in Last Six Months

)hlA b\\

7 011290 OJO

UNITED STATES SSINS No.:

6820 NUCLEAR REGULATORY COMMISSION Accession No.:

OFFICE OF INSPECTION AND ENFORCEMENT 7908220136 WASHINGTON, D.C.

20555 IE Bulletin No. 79-02 Revision 2 Date: November 8, 1979 Page 1 of 7 PIPE SUPPORT BASE PLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS Description of Circumstances:

Inspection experiences and the review of licensee response have identified several R2 areas where the Bulletin intent has not been adequately addressed by licensees.

R2 Revision No. 2 of the Bulletin is intended to clarify the intent of the Bulletin R2 and establish the NRC positions on minimum factors of safety, anchor bolt preload, R2 and the expected date of completion for certain Bulletin actions.

R2 Since the issuance of IE Bulletin No. 79-02 on March 8, 1979, IE inspection R1 experience and many inquiries from licensees indicate that additional informa-R1 tion and clarification is needed. This revision is intend 2d to serve that R1 pu rpos e. None of the requirements of the original Bulletin have been deleted, R1 and the due date for completion of the requested actions (July 6, 1979) has R1 not been changed. The following text supersedes the text of Bulletin No. 79-02.

R1 Changes from the original text are identified by R1, R2 in the margin. The pur-R2 pose of this revision is to identify acceptable ways of satisfying the Bulletin R1 requirements.

R1 While performing inservice inspections during a March-April 1978 refueling outage at Millstone Unit 1, structural failures of piping supports for safety equipment were observed by the licensee. Subsequent licensee inspections of undamaged supports showed a large percentage of the concrete anchor bolts were not tightened properly.

Deficiency reports, in accordance with 10 CFR 50.55(e), filed by Long Island Lighting Company on Shoreham Unit 1, indicate that design of base plates using rigid plate assumptions has resulted in underestimation of loads on some anchor bolts.

Initial investigation indicated that nearly fifty percent of the base plates could not be assumed to behave as rigid plates.

In addition, licensee inspection of anchor bolt installations at Shoreham has shown over fif ty percent of the bolt installations to be deficient.

Vendor Inspection Audits by NRC at Architect Engineering firms have shown a wide range of design practices and installation procedures which have been employed for the use of concrete expansion anchors. The current t are toward more rigorous controls and bolts.

DUPLICATE DOCUMEt{Tk2kh)9 The data available on dynamic testing fatigue failures can occur at loads s Entire document previously entered into system under: