e fg nDA @'S DISTRJBUTION:
"h"!\\' 'y )
f @T f
cket February 24, 1978
~
N DR L PDR ORB #a Reading Docket No. 50-289 VStello KRGoller/TCarter RWReid GZwetzig RInaram Metropolitan Edison Company OELD ATTH: Mr. J. G. Herbein 0ISE(3)
Vice President DEisenhut P. O. Box 542 TAbernathy Reading, Pennsylvania 19603 JBuchanan ACRS(16)
Gentlemen:
File By letter dated February 3,1978 (GQL 0138) you requested amendment of Operatina License No. DPR-50 for Three Mile Island Nuclear Station.
Unit No.1 (THI-1). The proposed amendment would revise the method ecoloyed to verify free operation of the reactor internals vent valves. Specifically, the present technical specification (4.16.1.c) states that the verification shall be made with a force equivalent to 10.15 to 1 30 psid, while you propose to change the specifica-0 tion to require verification simply with a f8rce of 400 lbs applied vertically upward.
In. reviewing the safety evaluation' accompanying this requested change, we find no technical justification has been presented for the value of 400 lbs (applied vertically upward) to show that it is equivalent to the values of < 0.15 to < 0.30 psid presently stated in the specification. Accordingly7 in order for us to review this ratter, you should provide such complete technical Justification.
In addition, you should explain clearly why this change, including any mechanical changes in the method used to perforn the test, does not involve a significant increase in the prtbability or consequences of accidents previously considered and does not involve a significant decrease in safety margin. You should also indicate the reason for requesting the change.-inasmuch as the reason stated in your submittal (NRC request) is not correct.
y.g W,s
..A h.
7,,.
,s E.
9 i
~
n
(
..~
5
'.% L
.a % s
..A;
.. s * %.s - - 4. e. 6,e __ %. %
,,3, a
7911080 7 0 [ [
\\
n.:
~
.,.a
.u 2-If this change is needed for the forthcoming refueline outage, all of the above infomation should be received by us at least 45 days before the change will be needed.
Sincerely, Robert W. Reid, Chief Operating Reactors Branch f4 Division of Operating Reactors cc: See next page
./
4 O
m w
4 4
m l
9
['
g
.e*
a
,g r
=
. f w
O w
4
,a ORd[4MR d4ADDR GZwetzitt:dr RRReid' 2/)f/78 20*ft78 g,,
a ma m. tm nuxn u:
- ~ s w""~""""""9"** "7"*"
'*"" ~ ~' " ~~'
l'etropoli tan... s Ccapany cc:
G. F. Trc.. bridge, Escui re Shait, Pi ttman, Potts & Trowbridge 1800 ;t Street, N.W.
Washington, D.C.
20036 GPU Service Corporation Richard W. Heward, Project it3 nager Itr. T. Gary Broughton, Safety and Licensing lianager 260 Cherry Hill Road Parsipp:ny, i:cti Jersey 07054 Pennsylvania Electric Company
!!r. R. !!. Cor. rad Vice President, Gen 2raticn 1001 Brc.J Street Johnr.toun, Pennsyivani 15007 lii ss ;'.ary V. Southard, Chairaan Citizens f:
a Safe Envircraer.t P. O. Box 405 Harrisburg, Fennsylv 2nia 17108 Gcvernment Publications Section State Library of Pernsylv:nia P.ox 1601 (Education Cuilding)
Harri sburg, Pennsylv:nia 17126
.