Forwards IE Insp Repts 50-445/79-15 & 50-446/79-15 on 790529-0604.No Noncompliance Noted
ML19276G705
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/02/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19276G706 List:
References
NUDOCS 7908270118
Download: ML19276G705 (2)


See also: IR 05000445/1979015

Text

.

'

'

- ~/4C

~

. pt %

i

UNITE D STATES

$ ,'!hp[. ?

^n

NUCLEAR REGULATORY COMMISSION

'

i

.

.$

HEGION IV

3 S. D,j

d'[

611 HYAN PLAZA DHtVE, SulTE 1000

[

AR LINGToN, T EXAS 76012

'

.s

July 2, 1979

In Reply Refer fo:

RlV

Docket No. 50-445/Rpt. 79-15

50-446/Rpt. 79-15

Texas Utilities Gennrating Company

KfT :

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the investigation conducted by Messrs. R. G. Taylor and

W. A. Crossman of our staff on May 29 through June 4, 1979, of activities

authorized by NRC Construction Permits No. CPPR-126 and 127 for the Comanche

Peak facility, Units No. 1 and 2, concerning allegations by a former Comanche

Peak employee.

The investigation and our findings are discussed in the enclosed investigation

report.

?;a items of noncompliance or deviations were identified.

Even though no itema of noncompliance with NRC requirements were identified

during this investigation, we did find that the allegations were essentially

true.

We also noted during this investigation that a thread of continuity

existed between this investigation and others recently conducted relative to

alleged problems uith site management and quality control in certain areas

of construction.

Although we feel that the najor organizational changes you

made in January 1978 have strengthened the QA/QC program at Comanche Peak, we

cannot ignore the f act that we are continuing to receive allegations concerning

construc tion practices.

Taken individually these allegations, some of which

have been substantiated, do not appear to have any significant adverse impact

on the conformance of your plant to NRC commitments.

IIcuever, as we discussed

in our meeting with you and Mr. Fikar, in our office on . ne 22, 1979, when

these allegations are taken collectively, there appears to be a morale problem

which is evidenced by several of the allegers and may be attributable, in

part, to communication problems between the workers and supervision.

In our

June 22 meeting, you indicated that you would look into these apparent

co=unication problems along with the adequacy of QA/QC indoctrination of

plant supervision and workers and take appropriate action to correct any

weaknesses that you detect in these areas. We intend to follow this matter

closely during subsequent inspections.

'

7908270

. .

. .

Texas Uti.litien Generating Cor.1pany

~2-

July 2,

1979

In accordanc.e with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

investigation report will be placed in the NRC's Public Dacument Roon.

If the

report contains any information that you believe to be proprietary, it is

necessary that you ;ubait a uritten application to this office, within 20 days

of the date of this letter, requesting that such inforr.iation be withheld f rom

public disclosure.

The application must include a full statement of the reasons

uhy it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If ue do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this investigation, ue will be pleased

to discuss then with you.

Sincerely,

.

,

h

)

,,

u w

-

3

U.C.Seidl*,) Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Investigation Report No. 50-445/79-15

50-445/79-15

cc: u/ enclosure

Texas Utilities GenernH ng Company

ATTN: M r . 11. C . S c hmid t , Project Manager

2001 Bryan Tower

Dallas, Texas

75201