ML19276G226

From kanterella
Jump to navigation Jump to search
Forwards Revision to HFIR Project Safeguards Contingency Plan for Final Acceptance Review.Plan Withheld (Ref Atomic Energy Act of 1954 & Energy Reorganization Act of 1974.)
ML19276G226
Person / Time
Site: 07000033
Issue date: 04/12/1979
From: Gonzales B, Sherman F
TEXAS INSTRUMENTS, INC.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
12601, NUDOCS 7905240078
Download: ML19276G226 (2)


Text

~,

>O 2

W s

i;

^ ;\\

u

.A

^

j.

J

.)

TEXAS INSTRUM EN TS INCORPORATED

.\\'

M ATIRI ALS & ELECTHicAi PRODUCTS GRoL**

to Q)

~

April 12, 1979 p

j 251979 y 5 Aiz %

M Director

'. g DOCgffUlON Office of Nuclear Material Safety Clfar and Safeguards

'4 g,

U.S.

Nuclear Regu]atory Commission Washington, D.C.

20555

Dear Sir:

Attached are the six (6) copies of our HFIR Project Safeguards Contingency Plan for your final acceptance review.

The revisions as noted in your letter of December 22, 1978, have been made in our plan wirh the exception of revising the terminology for the primary central alarm station and the secondary alarm station.

The terminology for the primary central alarm station and the secondary

'larm station will be changed in the " Plan for the Pu tection of Nuclear Facilities and Nuclear Materials" to bs consistent with the terminology in the HFIR Safeguards Contingency Plan in future administrative changes to the " Plan for the Protection of Nuclear Facilities and Nuclear Materials".

The fee for this plan was submitted with the original 4

.olan.

Ofp..-

Cordially,

^'

wi n-u Bob Gonzales Fred L.

Sherman HFIR Security Mgr., HFIR Project Administrator

/ck Enclosures

"/ o f>!? <3 4 (;

790524oogg'

.e %y.-

A TTLE 90RO, a4 ASS ACHU$ E TTS 027C3 e TELEPH0wE 517 22 2 2* M e CASLE: TEXINS

l DOCKu-t'0.' 70-5 0 k, '

im ':

4/- 2..f-7 $ -

(('

DATE:

N 3.1W

~ '

sy, lj.!

It0TICE T0 flRC PUBLIC DOCUMEili ROOM L-;

l l

l 1

i i

The following item (s) are being withheld from public disclosure 1

pursuant to the Atomic Energy Act of 1954, as arr. ended, and the i

Energy Reorganization Act of 1974.

sw pc Oshs & -

6 9

,e h.

N 1

$3;i'

'u 8

()

f-

~

....