ML19276F882

From kanterella
Jump to navigation Jump to search
Ack Re Proposed Const & Operation of Addl UF6 Capacity.States Revised Fundamental Nuclear Matl Control Plan & Matl Measurement Control Plan Must Be Approved by NRC Prior to Startup
ML19276F882
Person / Time
Site: 07000036
Issue date: 04/02/1979
From: Partlow J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Eskridge H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 7904240100
Download: ML19276F882 (1)


Text

.

,Vy H a c,,'/,,

UNITED STATCS NUCLEAR REGULATORY COMMisslON 3.Ikji

,,)

WASHINGTON, D. C. 20555

%&iaj'j APR 2 1979 SGML:RLJ 70-36 Combustion Engineering, Inc.

ATTft:

Mr. Harold E. Eskridge Supervisor - Nuclear Licensing, Safety & Accountability Rou te 21-A Hematite, Missouri 63047 Gentlemen:

This is in reference to your letter of March 22,15. i to Mr. W. T. Crow, Division of Fuel Cycle and flaterial Safety and prior telephone conversa-tions with our R. L. Jackson and Combustion Engineering's H. Eskridge regarding your proposed construction and operation of additional UF6 conversion capacity at the Hematita Plant.

Appropriate revised pages to your Fundamental Nuclear Material Control Plan (10 CFR 70.51 and 70.58) and the Material Measurement C]ntrol Plan (10 CFR 70.57) must be reviewed and approved by this Office prior to start-up of the referenced operation.

Particular emphasis should be placed on the affect the new operation will have on the Plant MUF and LEMUF.

Should you have questions or need additional information, please contact us.

Sircerel,

{

Jamt s G. Partlow, Chief Matc rial Control Licensing Branch Division of Safeguards 790424 0/00

-