From: Banks H
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19276F671 List:
References
LER-1-77-98, NUDOCS 7904060428
Download: ML19276F676 (2)


Text

.

CCNT ACL ELCCK (

l I

l

(

l (PLEASE &.. ANT ALL REQUIRED INFORM ATION) 1 6

o (CE NSE EwtNT (CENSit NAvi LCENSE NLuet A f'PE f'St NICIBlEIPl1]

l0 01-10 l0 IO l010 l-10 l 0 l l 4 l 1 Il Il Il l 0(3I 14 15 25 26 30 31 J2 CATE::Av

'

  • pt 5:L501 OCCuff NLveto tvtNf CAf[

R(PCC' OA*f ct> Cat aspeaf

N T !

I ILI ILI 1015 l Ol-f 013l 2l si i ll il Ol 91 7f 7J 1 12 10 ! s ! 7 I 7 !

57

$6

$5 50 61 6d ES 74 75

0 VENT CESCOc?CN With the reactor at power, in the RUN mode, RHR snubber on the steam condencint line I

50 was found inoperative by an auxiliary operator.

(Technical Specification 3.5.J.2) c0 I

aC l

60 RO l-77-98 i

eC psuut SvSitM CAv5E COwsay.tNf 00VpCP.E N T WANL 8:*'.Sfa

.cwcN 8

t
i
OvaCNENT ::E Swp5". E E CI F lEl (HlRlNlCIElR!

{A}

lBI2II I 0l lN!

10

.1 12 17 43 44 47 4e

AUSE CESCAi TCN The broken snubber was apparently caused by water hac
mer.

Periodic Test 8.2.2, RHR l

60 pumo operability was being performed daily due to the HPCI system beine inoperative EC l

(R0 1-7 7-9 5).

e3 METwCO OF ST Af:,,5

% POW E A CTHER Status 0:SO:vt a r Ors:Ovtav Ot30:J*CN 8 ac t.t v lE 0I 8l 6I l NA l

lB l l NA l

SC 9

10

,12 13 44 45 46 F:cu Cf A ?mtv N? TNT /

LCCAfCN OF : ELE ASE EE;f A5f 3 Of =tifaSE AMCUNT CF A f m? v l

lZ l Wl NA l

NA 60 9

10 11 44 45 2EASCNNEL Ex*CSUPES Nyveta

'vot CESA pfiCN l

010 10 i Wl NA 60 l

11

'2 13 2EASCNNEL LNJUA:ES l

NLM8t a

ESCtetCN Ol010 l NA 3

11 12 3FESiTE CONSECUENCES NA EC 1

' CSS CA OAMACE TO FAC117Y

'vot ss:setcs d

l NA sC 3

10 DUELC:TY l NA i:

3 ACCIT'CNAL FACTOAS I

l This 15. %ing recorted under Technical Specification Section 6.11.2.b(2).

eC l

--Ow

,,,,g 7904060T&%

~

_y f

LER CONTINUATION -- RO #1-77-98 Facility: BSEP #1 Event Date 11-4-77 Corrective Action:

The snubber was replaced.

Action to Prevent Recurrence:

The operators have been cautioned to ensure the RHR heat exchanger is isolated and the system is filled and vented prior to starting RHR pumps. Filling and venting the RHR steam cor.densing piping has been covered in operator training. Parts are on c-der to repair the stern condensing valves that leak through and, :.? ow ste am to collect in the RHR piping.