ML19276F325

From kanterella
Jump to navigation Jump to search
Forwards LER 79-002/03L-0
Date released: 10/17/2019 Download: ML19276F325


LER 79-002/03L-0 on 790227:during Biweekly Test of a Reactor Trip Breaker,Several Seconds Elapsed Following Trip Signal Before Breaker Tripped.Caused by Faulty Reactor Trip Relay,Westinghouse BFD31.Relay Replaced
ML19276F329
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 03/13/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-149
Download: ML19276F329 (2)
Forwards LER 79-002/03L-0
ML19276F324
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 03/13/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-149
Download: ML19276F324 (1)