ML19276E799

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in QA Program Insp Rept 99900286/78-02.Requests Addl Info Re Gas Metal Arc Welding Procedure
ML19276E799
Person / Time
Issue date: 01/11/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Bopp R
APV GAULIN, INC. (FORMERLY GAULIN CORP.)
Shared Package
ML19276E793 List:
References
REF-QA-99900286 NUDOCS 7903210104
Download: ML19276E799 (1)


Text

.

a t**'EC,

UNITED ST ATES L

[s NUCLEAR REGULATORY COMMISSION o

~,

REGION IV

{.,% - ( 7;#

9g,p r,

G11 RYAN PLAZA ORIVE, SUITE 1000 o, l'r i j

ARLINGTCN, TE XAS 7G011 p

11 Jar; 3979 Docket t;o. 99900285/78-02 Gaulin Corporation Attn:

Mr. R. Bopp Manager, Quality Assurance 44 Garden Street Everett, MA 02149 Gentlemen:

Thank you for your letter of December 27, 1978, in response to our letter dated flovember 13, 1978. As a result of our review, we find that additional information, as discussed with you during a telephone call on January 8, 1979, is needed.

Specifically, you did not address corrective actions relative to the Gas Metal Arc Welding procedure which was identified as not being qualified in the postweld heat treated condition.

Please provide this additional information within twenty (20) days in order that we may complete our review.

Sincerely, DlCvS (i

f.j Ul dis otapovs, Chief Vendor Inspection Branch 7903210lb