ML19276E799
| ML19276E799 | |
| Person / Time | |
|---|---|
| Issue date: | 01/11/1979 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Bopp R APV GAULIN, INC. (FORMERLY GAULIN CORP.) |
| Shared Package | |
| ML19276E793 | List: |
| References | |
| REF-QA-99900286 NUDOCS 7903210104 | |
| Download: ML19276E799 (1) | |
Text
.
a t**'EC,
UNITED ST ATES L
[s NUCLEAR REGULATORY COMMISSION o
~,
REGION IV
{.,% - ( 7;#
9g,p r,
G11 RYAN PLAZA ORIVE, SUITE 1000 o, l'r i j
ARLINGTCN, TE XAS 7G011 p
11 Jar; 3979 Docket t;o. 99900285/78-02 Gaulin Corporation Attn:
Mr. R. Bopp Manager, Quality Assurance 44 Garden Street Everett, MA 02149 Gentlemen:
Thank you for your letter of December 27, 1978, in response to our letter dated flovember 13, 1978. As a result of our review, we find that additional information, as discussed with you during a telephone call on January 8, 1979, is needed.
Specifically, you did not address corrective actions relative to the Gas Metal Arc Welding procedure which was identified as not being qualified in the postweld heat treated condition.
Please provide this additional information within twenty (20) days in order that we may complete our review.
Sincerely, DlCvS (i
f.j Ul dis otapovs, Chief Vendor Inspection Branch 7903210lb