Requests Addl Info Re Reactor Vessel Matls Surveillance Program within 60 Days.Recommends That Testing Be Postponed for Present,Pending Completion of Tests & Development Work Underway in Hsst Program
ML19276E702
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/27/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 7903200295
Download: ML19276E702 (3)


Text

% 7 290 50 301 i

/pn *tG%**e, UNITED STATES NUCLEAR REGULATORY COMMISSION 3%

E..

  • I"g! $

WASHINGTON, D. C. 20555 qw February 27, 1979 Docket Ncs. 50-266 and 50-301 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201

Dear Mr. Burstein:

In conducting our review of your letters of July 18,1977, and November 8,1978, relating to the reactor vessel materials surveillance program for Point Beach Nuclear Plant Unit flos. I and 2, we have determined that we will need the additional information identified in the enclosure to continue the review.

In order for us to maintain our review schedule, your response is requested within 60 days of receipt of this letter.

Three signed originals and forty copies are required.

Please contact us if you have any questions concerning this request.

In response to the question in your November 8,1978 letter regarding test procedures and analysis methods to be applied to the WOL specimens to show compliance with Section V of Appendix G to 10 CFR 50, we recommend that such testing be postponed for the present pending ccepletion of tests and development work currently undervay in the HSST program.

This work should be completed by the fall of 1979.

Accordingly, we should complete our review of this work and formulate our recommendations for testing and analysis of WOL specimens early in 1980.

Sincerely, /

/

/J.

r

--r4,,. e t/t ~s us V A. Schwencer, Chief 0:erating :.eactors Eranch =1 Division o# Ooera:ing :eac:ces Enc.iosure an: cc:

see nen :a;e 7903200A6

Wisconsin Electric Power Company February. 27, 1979

Enclosure:

Request for Additional Information cc w/ encl:

Mr. Bruce Churchill, Esquire Shaw, Pittman Potts & Trowbridge 1800 M Street, NW Washington, D.C.

20036 Document Department University of Wisconsin -

Stevens Point Library Stevens Point, Wisconson 54481 Wisconsin Electric Power Company ATTH: Mr. Glen Reed, Manager Nuclear Power Division Point Beach Nuclear Plant 231 West Michigan Street Milwaukee, Wisconsin 53201 O

Enclosure e,,.

RE0UEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT Your response dated July 18, 1977, to our generic letter of May 20, 1977 was not ccmplete in several respects. Specifically we require the following i.nformation on vessel weld and surveillance weld metals:

1.

Code number of surveillance weld, Unit No. 2.

2.

Type and batch of flux. (both units).

3.

Type and batch of weld wire (both units).

4.

Upper shelf energy or the results of any Charpy tests conducted (bothunits).

.