ML19276E484
| ML19276E484 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/10/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19276E485 | List: |
| References | |
| NUDOCS 7903140267 | |
| Download: ML19276E484 (2) | |
See also: IR 05000445/1978022
Text
.
- R80ud
UNITED STATES
f
'o
NUCLEAR REGULATORY COMMISSION
[~*s
~
REGION IV
5 f. >,
. .' o
$
611 RYAN PLAZA DRIVE, SUITE 1000
g
j[
o .
e
January 10, 1979
In Reply Refer To:
RIV
Docket No. 50-445/78-22
50-446/78-22
Texas Utilities Generating Company
ATTri: Mr. R. J. Gary, Executive Vice
President and General llanager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection activities performed by our Resident In-
spector, Mr. R. G. Taylor, during the period December 1-31, 1978, of
activities authorized by NRC Construction Permit Nos. CPPR-126 and 127
for the Comanche Peak facility, Units No. I and 2, and to the discussion
of our findings with Mr. R. G. Tolson and other members of your staff
during the inspection period.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection con-
sisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance viere iden-
tified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified
in paragraph 2 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written applic ation to
70031402 Q
'
,
,
-
.
Texas Utilities Generating
Company
-2-
January 10, 1979
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure. The application
must include a full statement of the reasons why it ' claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
- ~~
hl. C. Seidle, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/78-22
50-44S/78-22
cc: W/ enclosure
'
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201