Forwards IE Insp Repts 50-445/79-02 & 50-446/79-02 on 790108-10.No Noncompliance Noted
ML19276E474
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/18/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19276E476 List:
References
NUDOCS 7903140256
Download: ML19276E474 (2)


See also: IR 05000445/1979002

Text

'

.

p REcog

UNITED STATES

p

g

NUCLEAR REGULATORY COMMISSION

3

/

o

REGION IV

,

$

-

$

611 RYAN PLAZA DRIVE, SUITE 1000

'

  1. o '.

8

ARLINGTON, TEXAS 7G011

%'

5

3

January 18, 1979

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 79-02

50-446/Rpt. 79-02

Texas Utlities Generating Company

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. L. D. Gilbert and other

members of our staff during the period January 8-10, 1979, of activities

authorized by NRC Construction Permit Mos. CPPR-126 and 127 for the

Comanche Peak facility, Units No.1 and 2, and to the discussion of our

findings with Mr. R. G. Tolson and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

Within the scope of the inspection, no items of noncompliance were identi-

fied.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If the report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

7903140254

'

.

.

Texas Utilities Generating

.

Company

-2-

January 18, 1979

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

l

. cNdde.-

W.C. seq 1e Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report fio. 50-445/79-02

50-446/79-02

.

cc: w/ enclosure

Texas Utilities Generating Company

ATTil: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201