ML19276E429
| ML19276E429 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 01/17/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| References | |
| NUDOCS 7903120587 | |
| Download: ML19276E429 (2) | |
See also: IR 05000213/1978029
Text
ghoW
c,6
4
UNITED STATES
g
yq.
-' g
NUCLEAR REGULATORY COMMISSION
7 I.9(
0
REGION I
f
Ea 'h~g' /
$31 PARK AVENUE
g
xisc or prussia, rEnnsvi.vania i oS
17 JAN 1979
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/78-29
This refers to the im pection conducted by Mr. G. Napuda of this office
on December 11-15, 1978 at the Haddam Neck Plant, Haddam, Connecticut
and your corporate offices in Berlin, Connecticut of activities authorized
by NRC License No. DPR-61 and to the discussions of our findings held by
Mr. Napuda with hessrs. D. Deidrich and R. Graves and other members of
your staff at the conclusion of the inspection, and to a subsequent
telephone discussion between Mr. Napuda and Messrs. Diedrich and Graves
on December 20, 1978.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item
of noncompliance brought to your attention in a letter dated August 25,
'. 977. We have no further questions r_egarding your action at this time.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This item of noncompliance has been categorized into the levels as
described in our correspondence to you dated December 31, 1974. This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Although Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement of explanation,
we note that several examples of this item of noncompliance were corrected
and statements of appropriate planned corrective action were recef md
prior to the completion of the inspection.
Therefore, no response is
required, as these planned actions will be examined during a subsequent
inspection of your licensed program.
7903120
,
.
Connecticut Yankee Atomic
Power Company
2
17 JAN 1979
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such infomation from public
disclosure. Any such application must be accompanied by an affidavit
executed by the owner of the infomation, which identifies the document
or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by
the Comission as listed in subparagraph (b) (4) of Section 2.790. The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
<jS "
n/
'
E don J.
runner, Chie Pr -
Reactor Operations and Huclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-213/78-29
cc w/encls:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer