ML19276E076

From kanterella
Jump to navigation Jump to search
Ack Receipt of & Requests Addl Info Re Method to Be Used to Preclude Recurrence of Failure of Insp Supervisor to Periodically re-evaluate Calibr Cycles of Equipment Listed in Procedure CM-1005
ML19276E076
Person / Time
Issue date: 12/11/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ruddy A
AMETEK, Paragon Energy Solutions, INC.
Shared Package
ML19276E071 List:
References
REF-QA-99900112 NUDOCS 7903020290
Download: ML19276E076 (1)


Text

'

g.p a!cuq(o, UNITED OTATES g'

NUCLEAR RECULATORY CO.'.1MISS10N

[

' 1

{,k* g,.. rp/, _ $

REGION IV

%gl 611 RYAN PLAZA ORIVE, SUITE 1000

'gU4

/j ARLINGTON, TEXA3 76011 o

"v,,

O 11 OEC G78 Docket (40. 99900112/78-02 kaetek Corporation Calmec Division ATTN:

Mr. A. J. Ruddy General Manager 8401 East Slauson Avenue Pico Rivera, California 90660 Gentlemen:

Thank you for your letter of i'ovember 20, 1978, in response to our letter dated October 20, 1978. As a result of our review, we find that additional information, as discussed with your Mr. L. Ferguson during a telephone call on December 7, 1978, is needed.

Specifically, in response to f!otice of Deviation Item B.1, please provide a description of the method you will use to preclude recurrence of the failure of the Inspection Supervisor to pe*i-odically re-evaluate calibration cycles of equipment listed in Procedure CM-1005.

We have no further questions related to your response to Items A., B.2, and B.3 at this time. We will review your corrective and preventative actions on these items during a subsequent inspection.

Please provide this additiobal information within twenty (20) days in order that we may complete our review in a timely manner.

Sincerely,

?

3L c[ft : -cW v

Uldis Potapovs, Chief Vendor Inspection Branch 7903020/76