Text
,9
%M 4
j UNITED STATES g
NUCLEAR REGULATORY COMMISSION NM g,' s j
WASHINGTON, D. C. 20555 o
S g.'.+.,.,o#
S FEB 9 1979 Docket Nos. 50-445/50-446 Mr. R. J. Gary Executive Vice President and General Manager Texas Utilities Generating Company 2001 Bryan Towers Dallas, Texas 75201
Dear Mr. Gary:
SUBJECT:
REVIEW 0F CLASS IE EQUIPMENT QUALIFICATI0ft REFERENCING WCAP-8587, COMANCHE FEAK STATION I am enclosing a copy of a letter to the Westinghouse Electric Corporation (Mr. T. M. Anderson, Westinghouse from Mr. J. F. Stolz, NRC) dated February 6,1979 for your information.
The enclosed letter describes our plans to review on individual applications, such as the Comanche Peak Station, the equipment qualification program for Class IE electrical equip-ment referenced in the Westinghouse topical report WCAP-8587, " Methodology for Qualifying Westinghouse PWR-SD Provided NSSS Safety Related Equipment."
This is consistent with the approach we discussed with members of your staff at a meeting held on December 18, 1978. We expect that the review approach outlined in the enclosed letter will provide for an efficient review of WCAP-8587, and be responsive to the review schedule for Comanche Peak discussed at the meeting.
Please contact us if you desire any discussion or clarification of the enclosed letter.
Sincerely, htL f.
W Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management
Enclosure:
Letter from John F. Stolz to Mr. Thomas M. Anderson dated February 6,1979 ces w/ enclosure:
See next page 790302O /7f
j/
I
- Texas Utilities Generating Company FEB 9 979 CCs; Nicholas S. Reynolds, Esq.
Debevoise & Liberman 1200 Seventeenth Street Washington, D.C.
20036 Spencer C. Relyea, Esq.
Worsham, Forsythe & Sampels 2001 Bryan Tower Dallas, Texas 75201 Mr. Homer C. Schmidt Project Manager - Nuclear Plants Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 Mr. H. R. Rock Gibbs and Hill, Inc.
393 Seventh Avenue New York, New York 10001 Mr. G. L. Hohmann Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 Richard W. Lowerre, Esq.
Office of the Attorney General P. O. Box 12548 Austin, Texas 78711 Ms. Nancy Holdam Jacobson Coordinator, CFUR
?400 Hemphill Street Forth Worth, Texas 76104 Mrs. Juanita Ellis, President CASE P. O. Box 4123 Dallas, Texas 75208
~
~
mem em
- - =
=
4 ENCLOSURE UNITED STATES
[ }*
NUCLEAR REGULATORY COMMisslON
.g WASHINGTON, D. C 20555 t+
e
\\.7,, /
FEB 61979 Mr. Thomas M. Anderson,fianager Nuclear Safety Department Westinghouse Electric Corporatiol P. O. Box 355 Pittsburgh, Pennsylvania 15230
Dear Mr. Anderson:
SUBJECT:
REVIEW OF WCAP-8587, " METHODOLOGY FOR OVALIFYING WESTINGHOUSE PWR-SD PROVIDED NSSS SAFETY RELATED EQUIPMENT" Your November 15, 1978 letter transmitted Revision 1 to Supplement 1 of WCAP-8587 and requested a schedule for completion of our review of WCAP-8587, consistent with the schedules for reviewing license apoli-cations that reference this topical report.
We plan to complete our review of WCAP-8587 by reviewing several apoli-cations to operate plants that reference this tonical report as a basis for meeting the IEEE 323-1974 S tanda rd.
The lead plant is Comanche Peak.
The Texas Utilities Generating Company, applicant for Comanche Peak, has identified equipment to be used in Comanche Peak and has included infor-mation needed for our review of its qualification in the Comanche Peak docket by reference to WCAP-8587 and its Supplement.
Similarly, we expect; that applicants for operating licenses of other plants required to meet the IEEE 323-1974 Standard will orovide the necessary information for review of Class IE equipment qualification bv reference to the topical report. We will review those portions of WCAP-8587 needed to complete our review of equipment qualification for each operating license appli-ca tion.
When adequate information has been incorporated into WCAP-8587 as a result of these olant reviews, we will issue a safety evaluation for the topical report.
The SER for Comanche Peak is scheduled for April 1981.
Instead of issuing Round 1 and Round 2 questions as part of our equipment qualification review for Comanche Peak, we intend to issue questions to the applicant as soon as they arise.
We believe this anproach will expedite the review.
The applicant has been informed of our plans and is in general agreement with them. We estimate that the review of WCAP-8587 can be completed in 1981.
..m.
m.
L Mr. Thomas M. Anderson FEB 61979 We note that equipment qualification data packages (currently provided in Supplement I to WCAP-8587) reference several Westinghouse topical reports on seismic qualification methods and setsmic tests which have not been accepted for plants having construction permit applications docketed on or af ter October 27, 1972.
Our review of WCAP-8587 can be expedited as discussed in our October 18, 1978 meeting by your early submission of additional information (a) to show that seismic qualifi-cation methods described in these referenced topical reports meet the recommendations of IEEE 344-1975 as supplemented by Regulatory Guide 1.100, and (b) to justify your conclusion that, for certain items of equipment, the results of seismic tests described in these referenced topical reports would not be significantly changed if environmental tests and aging had been completed before the seismic tests were run as recommended in IEEE 323-1974 This additional information may be provided as supplements to the applicable topical repcrts or on the dockets of applicable plants.
We hope this letter clarifies the status of review of WCAP-8587 Sincerely,
( l a-j) e
,LAbl y
s John F. Stolz, Chief Lig'ht Water Reactors anch No. 1 Division of Project Management cc:
Mr. D. Rawlins Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230
,,,g.
,