ML19275E413
| ML19275E413 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/19/1980 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Budnitz R, Harold Denton, Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation, NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| Shared Package | |
| ML19274B925 | List: |
| References | |
| FOIA-82-92 NUDOCS 8005220950 | |
| Download: ML19275E413 (2) | |
Text
'
fe t'
- r Q&
. 8 RO 5 2 2A
- g.,
3 s
~,
x gon%%S
-> 1 p\\\\S W
'{ PW X'/p p0OR O MEMORANDUM FOR:
Victor Stello, Director, IE William J. Dircks, Director, HMSS Harold R. Denton, Director, NRR Robert Budnitz, Director, RES:
4
,Y Robert B. Minogue, Director, SD ' '
G. Wayne Kerr, Acting Director, SP FROM:
William J. Dircks, Acting Executive Director for.0perations 3
o
SUBJECT:
NEAR-TERM OPERATING LICENSE-REQUIREMENTS
.' ;W -
~
3 2.
~
~
Tne Comission approve'd the'Near-Term Operating License (NT0L) requirements '
of the TMI Action Plan on February 7,1980 (SECY memo contained in Enclosure 1).
It is therefore necessary that each of you implement your portion ofi these requirements as' identified in the Action Plan. contains; ;;
1 the approved list.
- y-,
w 3.
The following Offices are assigned lead responsibility for the designated i
actions:
NRR:
I. A.1. 3, I. A. 3.1, I. B.1.1. I.B.1.2, I. C. 5, I. C. 7, I. C. 8, I. G,
II.B.4, II.E.1.1, II.K.1,III.K.3. III.D.3.4, II.B.7, Part 2, and Part 4(1).
It is assumed that all of the.cequirements in Part 2 are well on
~'I their way to being implemented, since they have been previously.
approved.
Items I. A.l.3, I.A.3.1, I.C.5, II.K.3 and III.D.3.4 should be implemented as appropriate on operating reactors, reflecting feedback from the Comission at the February 11 meet-ing on the TMI Action Plan concerning implementation deadlines.
Utilities with facilities under construction should be ifformed of any ncu requirements.
IE; I.B.2.2, III.A.3.3, III.A.'3.1. III.D.2.4, and Part 4(2).
-SD:
II.B.8.
The notice of intent to conduct degraded core rulemakind is to ba. issued by March 15,1980. Note that a rule change is
..,,b included as. part of action II.B.7' j.:
y,g s
( p~
SP:.III.B.l.
g 4,5 p u
n
~
,4
+.
sa,
.~m.
,, ~ -
c.,,.
-u-a
+ * -
" - * '~ ~- ' ~
- =-
v
'; :n
. :Q ".
~:
7 - r s
v
~
~..
Office Directors 'c'
~. <
^
' cL a,
t Lead Offices are to coordina'~te with other Offices and ensure' that these requirements are implemented on a timely basis.
Each of these NT0L require-ments is to be specifically addressed in the NTOL Safety Evaluation Reports.
The second part of tae Ccmnission's request concerned impacts of the STOL require:xnts on your offices.
I understand you now are providing to the Steering Grouo taese innacts in terrs of lower priority acco plishments to
.crr j er '. o;;;j in jwr current enrnii.. phiis.
Ehca t.',is i 1terial u.
has been reviewed and approved by me, MPA.till rodify the operating plans and start the process of adding the TMI Action Plan requireaants to the Decision Unit Tracking System (DUTS).
Please cooperate fully with MPA in this reprograming.
I intend to monitor implementation via DUTS as well as thmugh periodic discussions with you.
x-gy-w g_.
3 e.
William J. Dircks Acting Executive Director for Operations
Enclosures:
1.
SECY memo 2/8/80 A '.
.,[
6}9 1 e
^
' ~ ~
' l
2.
Approved List 2/6/80
?),..
.x n
cc w/ enc: MPA e
. TMI Steering Group ^,
,r.
):
% :. T +
. d :.
g'
~
.o
.'N'.
p Distribution E00/RF N.Haller/RF T.Abel1/RF
+
W. Pike /RF Central Files
.C s
o u
v SEE PREVIOUS EELLOW FOR CONCURRENCES g.
~
J
=
( jf}
8
.1116MYA
_..EDO.
-r-dt.) fib) u
/
n
{[W_.J.Dircks
~
sunNAvt >
DAT E >
/80 NHC Form 3188 (4-79) NRCM 0240
. e u.... o v e. - a.,...= v.= > o, - e c a : i...-n.-m x.
. r.
, e
-'