ML19275A759
| ML19275A759 | |
| Person / Time | |
|---|---|
| Issue date: | 07/18/1979 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Nollenberger W SQUARE D CO., ELECTROMAGNETIC INDUSTRIES |
| Shared Package | |
| ML19275A745 | List: |
| References | |
| REF-QA-99900367 NUDOCS 7910190088 | |
| Download: ML19275A759 (2) | |
Text
Cenbl
[AR RfCg*o UNITED STATES bO 8T
~g NUCLEAR REGULATORY COMMISSION n
$e E
REGION IV e'['
0,,
611 RYAN PLAZA DRIVE, SUITE 100o AR LINGToN, TEb4S 76012 18 JUL bia Docket No. 99900367/79-01 Square D Company Assembly Services Division Aten:
Mr. W. C. Nollenberger Vice President, Power Equipment Group 252 Tippecanoe Peru, Indiana 46970 Gentlemen:
This refers to the QA Program inspection conducted by Mr. W. E. Foster of this office on June 25-28, 1979, of your facility at Peru, Indiana, associated with manufacturing and fabricating motor control centers, switchboards, and pa.31-boards and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique. quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires cach of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.,You should therefore not conclude that the NRC's inspection exempts you from in'spections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.
Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will he completed.
\\\\l9
\\il 7910190 6
Square D Company 2
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Cot: mission's Public Docu=ent Roon. If this report contains any infor=ation that you believe to be proprietary, it is necessary that you make.a written application within thirty (30) days to this office to withhold such infor ation from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary informa-tion identified in the application is contained in a s2parate part of the doe cent.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions conearning this inspection, we will be pleased to discuss them with you.
Sincerely, I
h
]
/N%L )
se v Uldi capovs, chi f Vendor Inspection Branch Encitsures:
1.
Notice of Deviation 2.
Inspection Report No. 99900367/79-01 1179 112