ML19275A720

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/79-25 on 790806-08.No Noncompliance Noted
ML19275A720
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/30/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19275A721 List:
References
NUDOCS 7910190018
Download: ML19275A720 (2)


See also: IR 05000395/1979025

Text

D

'# "*4'o

Jb9S95

.

UNITED STATES

E"

NUCLEAR REGULAlORY COMMISSION

'

,

w

n

$

" - E

REGION 11

o,

'[

101 MARIETTA sT., N.W., SUITE 3100

j'

ATLANTA, GEORGIA 30303

.....

In Reply Refer To:

gG 3 0 SN

,

,

RII:TJD

'

-

50-395/79-25

South Carolina Electric and Gas Company

Attn:

T. C. Nichols, Jr., Vice President

Power Production and System Operations

Post Office Box 764

Columbia, South Carolina 29218

'I

Gentlemen:

This refers to the inspection conducted by Thomas J. Donat of this

office on August 6-8, 1979 of activities authorized by NRC Construction

Perciit Nt

CPPR-94 for the V. C. Summer facility, Unit No. 1, and to the

discussion of our findings held with 0. S. Bradham at the ~onclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code af Federal Regulations, a copy of this lett.er and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Ty such applict. tion must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report vill be placed in the

Public Document Room.

1179

017

0 \\ Y

-.91019 0

%

G

'

.

.

s

AUG 3 u 1979

South Carolina Electric

.

and Gas Company

-2-

Should you have any questions concerning this letter, we will te glad to

discuss them with you.

Sincerely,

f

4f4s-t

k

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

9

Enclosure.

Inspection Report No. 50-395/79-25

cc w/ enclosure:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N.W.

Washington, D.C.

20006

A. A. Smith

Quality Assurance

Post Office Box 8

Jenkinsville, South Carolina 29065

0. S. Bradham, Manager

Nuclear Operations

Post Office Box 8

Jenkinsville, South Carolina 29065

1179

018