NRC s ome 173 u s nucle AR mE cut Af ony covvissioN onDE R NuusE n (2 784 20-79-169 DATE STANDARD ORDER FOR DOE WORK

. September 14, 1979 ISSUE D TO (DOE Of fice)

ISSUE E, BY. (NRC Of f ece)

ACCOUNTING CIT ATION

^"*a

""'^o" 5

  • 8o' Chicago Operations Office Off. of Nuclear Reactor Regulation 31X0200.209 B&R NUMBE R PERFORMING ORGANIZATION AND LOCATION 20-19 03-1 FIN NUMBE M Brookhaven National Laboratory A-3117 - 9 WOR K PE Ri JD. THIS ORDER FIN TITLE FIXED D ESTIM ATE DG Inservice Inspection FROM.

TO 10/1/78 9/30/8n OBLIG ATION AVAILABILITY PROVIDED BY:

A THIS ORDER 25,000 B TOTAL OF ORDERS PL ACED PR40R TO THis DATE WITH THE PE RFORMiNG ORGANIZ ATION UNDER THE SAVE "APPROPRI ATION SYMBOL" AND THE FIRST FOUR DIGITS OF THE 3,563,000 "B&R NUMBE R" CITE D A8OVE C. TOTAL ORDERS TO DATE (TOTAL A 8i B) s 3,588,000 D AMOUNT INCLUDED IN "C" APPLIC ABLE TO THE " FIN NUMBER" CITED IN THIS ORDE R.

I 225,000 FINANCI AL FLEXIBILITY.

@ FUNDS WILL NOT BE REPROGRAMMED BETWEEN FINS LINE D CONSTITUTES A LIMITATION ON OBLIGATIONS

' AUTHORIZED.

O FUNDS MAY BE REPROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO $50K LINE C CONSTITUTES A ON OBLIGATIONS AUTHORIZED STANDARD TERMS AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED, ATTACHME NTS THE FOLLOWING ATTACHMENTS ARE HE REBY SECURITY:

MADE A PART OF THIS ORDER:

E WORK ON THIS ORDER IS NOT CLASSIFIED-0 STATEMENT OF WORK O WORK ON THIS ORDER INVOLVES CLASSIFIED O ADDITIONAL TERMS AND CONDITIONS IN F OR M ATION NRC FORM 187 IS ATTACHED.

O OTHER REM AR KS:

PLEASE SIGN THIS ORDER PRIOR TO SEPTEMBER 30, 1979 AND SEND A COPY TO M. PAULETTE TRIPLETT, NRR, P-428 3SUl(JG AUTHORITY ACCEPTING ORGANIZATION m

v harbaa Hul'1 As t R

c NTLE

'/

/

a TITLE

.//; & '/ /

NRCFORM 173 (2-78)

/

)[

q 910030 7(g6,

ENCLOSURE 1 SCOPE OF WORK Technical Assistance on Inservice Testing Programs Review as required by 10 CFR 50.55 a(g).

BNL will provide technical assistance to the D0R staff in the review

,of Inservice Testing Program for pumps and valves as required by 10 CFR 50.55a(g).

The review will include the reivew of proposed and updated programs for the following power stations:

Connecticut Yankee Cooper Indian Point 2 San Onofre Three Mile Island Kewaunee Yankee Rowe Browns Ferry 1, 2, 3 Fitzpatrick Arkansas Point Beach Pilgrim 1 The program objectiie is to provide recommendations to the staff's evaluation of the licensee's proposed and periodically updated inservice testing program to assure compliance with the regulations.

The scope of the work includes:

a)

Evaluating the technical basis for relief from ASME Section XI ode requirements taken by the licensee that are determined to be impractical for his facility.

b)

Provide input for round one questions which will be transmitted to the licensee to request additional information.

c)

Evaluating the licensee's responses and participating in meetings with the NRC and the licensee to resolve f ether differences. This may involve trips to the plant or the NRC to have meetings with the

licensee, d)

Prepare a written input to the Safety Evaluation Report on the proposed inservice testing programs.

e)

In addition to the technical review, BNL will assist the staff in clarifying governing documents, in responding to ACRS requests for information and by appearing ct hearings.

1C?2 033

i e

MILESTONES TASK DEC 78 MAR 79 JUN 79 Task I 1)

Cooper

2) San Onofre
3) Three Mile Island 4)

Kewaunee 5)

Browns Ferry

6) Arkansas a) The SER's for the above are completed but need to be re-written in a different format.

Task 2 7)

Connecticut Yankee A

~'5 a) Review IST submittal b)

IST review session with a

licensee

-J c) Complete ',ER for IST program Task 3 8)

Yankee Rowe a)

Review 151 submittal

-4 b)

IST review session with a

licensee J

c) Complete SER for IST program Task 4 9)

Indian Point 2

-J a)

Review IST submittal b)

IST review session with i

licensee

-A c)

Complete SER for IST program

'(

J MILESTONES I

/

TASK DEC 78 MAR 79 JUN 79 Task 5 10)

FitzPatrick l

a) Review IST submittal

-A l-b)

IST review session with A

licensee c) Complete SER for IST

.-- a program Task 6 11)

Point Beach a)

Review IST submittel

--- A b)

IST review session with a

licensee c)

Complete SER for IST

___a program Task 7

12) Browns Ferry 2 a)

Review IST submittal

__f b)

IST review session with licensee c)

Complete SER for IST

__J program Task 8

13) Browns Ferry 3 a)

Review IST submittal

_s b)

IST review session with licensee c) Complete SER for IST

__J program 1C92 035

MILESTONES

/

TASK DEC 78 MAR 79 JUN 79 Task 9 14)

Pilgrim 1 a) Peview IST submittal

~

b)

IST review session with a

licensee cj Comp ~,ete SER for IST w

program I

i C"j2 036