Forwards IE Insp Repts 50-460/79-08 & 50-513/79-08 on 790717-20.No Noncompliance Noted
ML19275A224
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/10/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19275A225 List:
References
NUDOCS 7910030343
Download: ML19275A224 (2)


See also: IR 05000460/1979008

Text

'o

UNITED STATES

[V

[y-)n

/g

NUCLEAR REGULATORY COMMISSION

  • -

.c

REGION V

"

bff

'#

1990 N. CALIFORNI A BOULEVARD

o

%

,/

SUITE 202, WALNUT CRE EK PLAZA

e,,,a

WALNUT CREEK, CALIFORNIA 94596

August 10, 1979

Docket flos. 50-460

50-513

Washington Public Power Supply System

P. O. Box 968

-

Richland, Washington 99352

Attention: Mr. fl. O. Strand

Managing Director

,

Gentlemen:

'

Subject: ilRC Inspection at Washington Nuclear' Project Hos.1 and 4

(WNP-1/4)

This refers to the inspection conducted by Mr. T. W. Bishop and

Ms. E. A. Kleinsorg of this office on July 17-20,1979 of activities

authorized by fiRC Construction Permit flos. CPPR-134 and CPPR-174, and to

the discussion of our findings held by Mr. Bishop'with Mr. W. C. Bibb

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

No items of noncompliance with flRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure'

1C 2 229

791003o39'3

.

Washington Public Power Supply System

-2-

August 10, 1979

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

.

wuv

G. S. Spencer, Chief

Reactor' Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

flos. 50-460/79-08

50-513/79-08

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

J. P. Thomas, Project fianager, WPPSS

b<2 2