Forwards IE Bulletin 79-14,Suppl 1, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML19274G124
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 08/15/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Weigand J
GULF STATES UTILITIES CO.
References
NUDOCS 7908290693
Download: ML19274G124 (1)


Text

M

,g nto

[

o UNITED STATES I,,g NUCLEAR REGUL ATORY COMMISSION 8 y).7,(l{/- [C

"/

REGION IV 0,,

Gil RYAN PLAZA DRIVE, SulTE 1000

%, *' *b#

AR LING TON, TEXAS 7GG12

,o August 15, 1979 In Reply Refer To:

RIV Docket Nos. 50-458/ Supplement IE Bulletin No. 79-14 50-459/ Supplement IE Bulletin No. 79-14 Gulf States Utilities Attn:

Dr. J. G. Weigand General Manager, Nuclear Projects Post Office Box 2951 Beaumont, Texas 77704 Gentlemen:

The enclosed supplement to IE Bulletin 79-14 is forwarded to you to provide added guidance on the intent of the IE Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, Karl V. Seyfrit

/

Director

[

Enclosures:

1.

Supplement IE Bulletin No. 79-14 2.

List of IE Bulletins Issued in the Last Six Months 2008 909 7 908 2 9 0 M.3

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 Supplement IE Bulletin No. 79-14 Date: August 15, 1979 Page 1 of 2 SEISNIC MD. LYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:

IE Bulletin No. 79-14 was issued on July 2, 1979, and revised on July 18, 1979.

The Bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants.

This supplement to the Bulletin provides additional guidance and definition of Action Items 2, 3, and 4.

To comply with the requests in IE Bulletin 79-14, it will be necessary for licensees to do the following:

2.

Inspect Part of the Accessible Piping For each system selected by the licensee in accordance with Item 2 of the Bulletin, the licensee is expected to verify by physical inspection, to the extent practicable, that the inspection elements meet the acceptance crite.ia.

In performing these inspections, the licensee is expected to t,e measuring techniques of sufficient accuracy to demonstrate that acceptance criteria are met.

Where inspection elements important to the seismic analysis cannot be viewed because of thermal insulation or location of the piping, the licensee is expected to remove thermal insulation or provide access. Where physical inspection is not practicable, e.g.,

for valve weights and materials of construction, the license is expected to verify conformance by inspection of quality assurance records.

If a nonconformance is found, the licensee is expected in accordance with Item 4 of the Bulletin to perform an evaluation of the significance of the nonconformance as rapidly as possible to determine whether or not the operability of the system might be jeopardized during a safe shutdown earthquake as defined in the Regulations. This evaluation is expected to be done in two phases involving an initial engineering judgement (within 2 days), followed by an analytical engineering evaluation (within 30 days). Where either phase of the evaluation shows that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement and complete the inspections required by Item 2 and 3 of the must report the results of these ments for content and schedule a DUPLICATE DOCUMENT Entire document previously entered into system under:

2 f_,