ML19274G009
| ML19274G009 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/26/1979 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7908270312 | |
| Download: ML19274G009 (3) | |
Text
h e**r e**WA,
e c m' %
f[f[')S S'
U E MiiC P ~ '
~i
! T ;,
,g;,.-
a,Q } -
4
')
111N9 A 0* 13 Florida
-I Power CO RPO a a f 80%
June 26, 1979 Mr. J.
P. O'Reilly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 101 Marietta Street, Suite 3100 Atlanta, CA 30303
Subject:
Docket No. 50-302 Operating License No. DPR-72 1.E.
Dear Mr. O'Reilly:
Enclosed is our revised response (initial response dated May 21, 1979) to I. E.
Bulletin 79-10 dated May 11, 1979 concerning requalification training program statistics.
Our response is in the format requested in the subject bulletin and reflects the annual examinations given to date at Crystal River Unit 3.
Please contact this of fice if you require any additional information.
Very truly yours, FLORIDA POW R CORPORA' ION
'LLb W.
P. Stewart Manager, Nuclear Operations Enclosure WPShewT05 D6 cc:
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Project Management Operator Licensing Branch Washington, D.C. 20555 File: 3a-0-3-a-3 79 0827 0 3/A
}(Jpc/'ggL orr3CIAl col'I Florca 33733 e 813 -866 5151 1
i e
r
Utility:
Florida Power Corporation Date: June 26, 1979 Facility: Crystal River Unit 3 Operators Senior Operators 1977 1978 1979 1977 1978 1979 a
Exam Exam Exam Exam Exam Exam Exam Exam 1
2 3
4 1
2 3
4 1.
Action 1:
Responses A.
Total number failed 1
0 1
1 0
0 annual examination B.
Percent that failed 4.5 0
2.7 7.1 0
0 annual examination 2.
Action 2: Responses A.
Percent required to 81.8 33.0 67.6 85.0 23.0 86.9 attend additional lectures B.
Number of operators b
attending specified 2/1 7/l 971 number of lectures 3/2 1/2 6/2 3/1 1/1 4/1 d
(no. of operators /
2/3 6/3 LC 3/2 0/2 7/2 C
no. of lectures) 6/4 1/4 1
3/3 6/3 I
3/5 2/5 2/4 2/4 1/5 1/5 2/7 1/6 3.
Action 3: Responses A.
Total number attend-1 0
1 1
0 0
ing accelerated training lesson because 70 percent on annual written examination B.
Percent attending 4.5 0
2.7 7.1 0
0 accelerated training lesson because 70 percent on annual written examination 0
0 Not Applicable C.
Total number attend-Not Applicable ing accelerated training because unsatisfactory oral examination Tibbs (Table) D71
TABLE 1 (Continued)
Operators Senior Operators 1977 1978 1979 1977 1978 1979 Exam Exam Exam Exama Exam Exam Exam Exama 1
2 3
4 1
2 3
4 3.
(Continued) e e
D.
Percent Attending Not Applicable Not Applicable accelerated train-ing because unsat-isfactory oral examination Date of Exam 1 Sept /0ct 1977 2
Feb/ Mar 1978 3
Jan/Feb 1979 4
See Note a A fourth exam has not been conducted but is tentatively scheduled for early Notes:
a.
1980.
b.
An additional reactor operator should have attended an exam review, but did not.
c.
Exans have been completed for 1979. Exam retraining is in process but has not been completed.
d.
One senior reactor operator was required to attend two exam reviews, but attended only one.
No oral examinations or walk-through examinations are given at Crystal e.
River Unit 3.
10 CFR 55, Crystal River Unit 3 FSAR Chapter 12C, Requalification Program and AI-800 "Requalification Program" do not require oral exams as part of their requalification program.
Additional Information:
Notes b & d were identified in Report 79-22 as items of noncompliance.
Tibbs (Table) D71