ML19274F834

From kanterella
Jump to navigation Jump to search
Forwards Records Investigation in Response to IE Bulletins 78-12,12A & 12B & Suppls.No Deviations Detected,As Certified in Section 3 of Rept.W/O Encl
ML19274F834
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/27/1979
From: Conn W
GENERAL ELECTRIC CO.
To: Reinmuth W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19274F832 List:
References
NUDOCS 7908090007
Download: ML19274F834 (6)


Text

.

..~

c.cc,cmG E N E R A L ([f E L E C T R I C

' ' ^ " ' " ' " "

!/.hY 2 673 E N GIN E E RIN G

ERANL C Ah COMPANY.175 CURTNER AV" SAN JOSE, CAUFORNIA Gs12s DIVISION s

~ p. 3;_c7 3;;3n,: r April 27, 1979

c. 2 c:ca. ___

f'S' 2 2 879

...... n t-Mr. Wayne G. Reinmuth

..... r.. :-

- --- ~ "

Office of Inspection and Enforcement

-.-- C':

U.S. Nuclear Regulatory Comission


})..

Washington, D.C.

20555

]{ _i

.T.~.

Subject:

Response to IE Bulletins 78-12,78-12A and 78-12B

Reference:

Reactor Pressure Vestel:

Hope Creek I Previous Designation:

Newbold I (Public Service Electric and Gas)

Dear Hr. Reinmuth:

The enclosed report, " Records Investigation in Response to IE Bulletins 78-12,78-12A and 78-128 Supplements" has been pre-pared for the referenced reactor pressure vessel.

As mentioned in the report, the vessel was built by Babcock-Hitachi in Japan for the General Electric Company.

Our pur-chase order for this vessel required Babcock-Hitachi to submit certain specified records to show compliance with the require-ments.

Some of the records contained in this report were obtained from the above submittal.

Others had to be obtained from Japan, and General Electric Company personnel in Tokyo (GETSCO) were re-quested to assist in obtaining these records.

Consequently, the enclosed report represents the most thorough records search General Electric could rake within the allotted time.

You should note that Babcock-Hitachi was only asked to submit certain spec-ified types of records to our GETSCO personnel, and that the re-review and compilation of these records was performed by General Electric Company Quality Control personnel.

Please note that we did not detect any deviations as certified in Section 3 of the report.

Consequently, we have reached the general conclusion that it is very unlikely that conditions similar to those described in IE Bulletin 78-12 exist'in the Hope Creek reactor pres-sure vessel.

T9080gae,

Mr. Wayne G. F.ein uth April 27,1979 Page 2 If you have any questions concerning the enciosed report, please contact the writer at (408) 925-6751. l,

Very t ruly yours.,

Il; 7, '

e

} f/fle lL Werr.cCd'5nn- }48.: nager Quality Control Engineering Vessels, Internals & Heat Exchangers H/C 731 - Extension 56751

/vf enc.

m N

9 4-~

9 4

e b

a

M G E N E R A L gy.

L E C T R I C E

s u C t. c n n e s e a c y PROJECTS D I Vi t l O li ricRAL ELECTT4 0 CO!.'.PAf?Y 175 CURTriER AVE., SAN JOSE, CALIFORNIA 95125 MC 391, (409) 925-3580 i

May 15, 1979 iI

--~~~l GB-79-139 P.~.'."Mii E2 i:,:: c:.

--- k Mr. H. E. Morris

? *'.l , C O l

Project Engineer I

Bechtel Power Corporation

~ *~~ i..

. ? I

~~~

P. O. Box 3965 San Francisco, CA 94119 c'

- - - - ~ ~ ~ "

l j

Dear Mr. Morris:

L' T "

.._.3 c

SUBJECT:

HOPE CREEK PROJECT TRANSMITTAL OF GE VERIFICATION PACKAGE FOR i;RC IE BULLETINS N05. 78-12,78-12A AND 78-12B " ATYPICAL WELD MATERIAL IN RPV WELDS"

Reference:

Quotation No. 149 contained in letter J. Larrew to H. Morris, GB-79-125, dated fiay 1, 1979 General Electric Company is pleased to transmit the specific vessel verification information required by the subject NRC bulletins which are not covered by the vessel manufacturers' generic reports.

Hope Creek 1 Vessel - Hitachi A report has been submitted to the NRC after review of the necessary records.

We recommend that you use the attached lette-to Wayne G. Reinmuth from Werner C. Cohn in your response.

IE Bulletin 78-12 requires that the NRC be informed on the availability of archive weld materials, which might be used for verification purposes.

This letter serves to inform you 'that Babcock-Hitachi Company, to the best of our knowledge, has no arci,cive materials.

Hool. Creek 2 Vessel-CBIN

- - - - - - - - ~

~

e In c'4 der for PSE&G to comply with the required response action to NRC IE Bulletins78-12A Item 2 and 78-12B Item 2, we recommend that you use the docut.ents attached; namely (1) GE verification letter dated May 11, i

i 1979, (2) CBIN letter dated May 1,1979 and (3) C3IN certification dated April 30, 1979.

~

G E N E R A L () E L E CI P.i c Mr. H. E. Pcrris Page 2 May 16, 1979 transmitted to the fiRC on May 1We feel the docum G herewith along with the reports fiRC IE bulletins for these vesse,ls 1979 complete GE's response to the and the tasks of our referenced proposa c

to call this office.If you have any questions concerning th ese documants, please do not hesitate Very truly yours, d

J. C. Larrew Project Manager' Hope Creek Project Attachments cc:

J. T. Boettger, w/ene.

e l

e.

I l

\\

4