ML19274F092
| ML19274F092 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 05/02/1979 |
| From: | Groce R YANKEE ATOMIC ELECTRIC CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-79-04, IEB-79-4, WYR-79-54, NUDOCS 7906130106 | |
| Download: ML19274F092 (2) | |
Text
' ~ " *
~4,,.ia; Telephone 617 366-9011 rwx 780-390-0739 YANKEE ATOMIC ELECTRIC COMPANY B.4.2.1 20 Turnpike Road Westborough, Massachusetts 01581
,YJblKEE M 79-54 May 2, 1979 United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement Mr. Boyce H. Grier, Director
References:
(a)
License No. DPR-3 (Docket 50-29)
(b)
I&E letter to YAEC dated 3/30/79 I&E Bulletin No. 79-04
Dear Sir:
Subject:
Response to I&E Bulletin No. 79-04 In response to your letter of March 30, 1979, I&E Bulletin 79-04, Yankee Atomic Electric Company hereby submits the following information relative to swing check valves manufactured by the Velan Engineering Corporation.
Item 1, Response:
Yankee Nuclear Power Station has in use at this time 3, 4 and 6 inch diameter swing check valves manufactured by Velan Engineering Corporation. These valves are located in the plant's emergency core cooling system (ECCS).
Item 2, Response:
The ECCS system at Yankee Nuclear Power Station was designed in accordance with the requirements of ANSI B31.1-1967.
The small difference in valve weights is more than compensated for by the inherent conservatism of the design code.
Item 3, Response:
The design methods for the Yankee Nuclear Power Station are currently being reviewed as part of the SEP. Should any re-evaluations be required 7 9 0 613 01c6
'.. 2,.
U.S. Nuclear Regulatory Commission May 2, 1979 Attn: Office of Inspection and Enforcement Page 2 the new valve weights will be utilized.
As stated above, the small change in valve weight hcs an insignificant effect on system stresses. No reanalysis is required at this time.
Item 4. Response:
We have determined that no modifications are required.
Item 5, Respor.3e:
Not applicable.
We trust this information meets your approval. Should you have any questions in regard to this matter, please contact us.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY Robert H. Groce Licensing Engineer