ML19274F038

From kanterella
Jump to navigation Jump to search
Forwards LER 79-026/03L-0
Date released: 10/15/2019 Download: ML19274F038


LER 79-026/03L-0 on 790507:analyzer 02 Was 1-CAC-ATH-1259;2 Was Reading Upscale on 0-5T Scale,When Actual Reading Was 18.5% on 0-25% Scale.Caused by Split Rubber Hose Leading from Air Sample Inlet Fitting.Tube Repaired
ML19274F039
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/04/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274F039 (1)
Forwards LER 79-026/03L-0
ML19274F037
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/05/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274F037 (1)