Text
.... _.
s I
tO N II
{'
' 771Gif NORTH CAROLINA STATE UNIVERSITY AT RALEIGH 19 APR 2 A O.*sphL OF ENGINEERING DEPARTNENT or Nuctram Encinstainc Bos $616 Zar 27t,50 17 April'1979 ADM 1-10-1 Richard C. Lewis, Acting Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Co r.ission Ref: RII:TJMc Region II 50-111/79-02 101 Marietta Street, N. W.
50-297/79-02 Atlanta, Georgia 30303
Dear Sir:
his is in response to your report referenced above concerning the findings of Inspectors McHenry and Julian during a routine, unannounced inspection of the North Carolina State University PUMTAR Reactor Faci-lity 13-16 March 1979 We vill address Appendix A, Notice of Violation, directed to the NCSU PUMTAR Facility and respond in conformance to 10CFR2.201(1), (2),
and (3).
Item A. (1) A procedure has been developed as required by 10CFR21 to assure that a responsible officer of the University is informed of a defect or failure of a basic co=ponent which could create a substantial safety hazard.
(2) h e notices which are to be posted in conformance to 10CFP21.6 vill be displayed in a prominent position.
(3) Full co=pliance vill be achieved by 11 May 1979 Ite= B. (1) he temporary change previously in effect and identified in this inspection has been withdrawn and the procedure for adjusting the Log N compensation voltage has been placed in Section 3 1.1.F.10 of the PUE TAR Operations Manual and documented as Advance Chan6e 14E (2) Advance Change 145 vill be transmitted to the Padiation Protection Council for review, thus satisfying the re-quirements of Technical Cpecificatior 6.3.b.
VI (3) Full compliance vill;be' achieved by 11 Fay 1979 I/
Dereweresix(6)itemsleftopenforsubsequentNRCreviewfrom the 13-16 March 1979 inspection. ta cee of these items (Advance Change i
790607003 3 f@f
. UFFlcIAL COPY i 3.. t i...
s s.
...<.,...r,..s,.
Ir
..r.
..,n r.,s...
.......,..,..a.... 4
t Pi hard C. Lewis, Acting Chief Page 2
.:ter Operations and Nuclear Support Branch a
documentation, RW review of existing Advance Char.ges and Pulsing Pro-cedure SP 4.2) are currently being resolved. To of the six items (elimindtion of cross-contatination possibility and Pulse Rod removal and repsiir before further use) both require substantial mechanical cor-rectionsand we anticipate a 1 July 1979 completion date for these items.
h e remaining open item concerns the Neutron Radiography facility design and test results.
L e RFC has been advised of the NEU status by letter on 22 March 1979 that the facility design and test results are not yet finalized.
Should you have need for further information, we stand ready to respond.
Yours truly, I
N
'Lf-1p.O c O,
, WG A '"
p TCB*
homas S. E11eman Head TSE:1pe cc:
J. R. Bohannon, Jr.
W.,L. Dura Radiation Protection Council r
L 4
e 9
?>
d5
- d O
o'
$67 87