Forwards QA Program Insp Rept 99900356/79-01 on 790212-15 & Notice of Deviation
ML19274E963
Person / Time
Issue date: 03/20/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Duncan C
BURNDY HUSKY
Shared Package
ML19274E960 List:
References
REF-QA-99900356 NUDOCS 7906070023
Download: ML19274E963 (2)


Text

.

pn mao UNITED STATES f

o, NUr. LEAR REGULATORY COMMISSION

[ 5, REGION IV

$-')f

.,. g 611 RYAN PLAZA DRIVE, SUITE 1000 f

AR LINGTON, TEXAS 76011 o

2 0 MAR @

+****

Docket No. 99900356/79-01 Burndy Corporation Husky Products Division ATTN: Mr. C. F. Duncan Quality Assurance Manager 7405 Industrial Road Florence, Kentucky 41042 Gentlemen:

This refers to the QA Program inspection conducted by Mr. J. W. Sutton of this office on February 12-15, 1979, of your facility at Florence, Kentucky, associated with the fabrication of electric cable support systems and to the discussions of our findings with Mr. D. Ring and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, cc,mponents or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined and our findings are discussed in the enclosad report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Iluring the inspection it was found that the implementation of your QA erogram failed to meet certain NRC requirements.

The specific findings and reference; to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

q906010

Burndy Corporation In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will ta placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such infonnation from public disclosure.,Any such aaplication must include a full statement of the reasons on the basis of whi:h it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contr.ined in a separate part of the document.

If we do not hear from you in tnis regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.9 fE mwhuY W U1 dis Potapovs, Chief Vendor Inspection Branch

Enclosures:

1.. Notice of Deviation 2.

' Inspection Report No. 99900356/79-01