Forwards IE Insp Rept 50-335/79-02 on 790117-19.Notice of Violation Withheld (Ref 10CFR2.790)
ML19274E745
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/14/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML19274E743 List:
References
NUDOCS 7904240278
Download: ML19274E745 (2)


See also: IR 05000335/1979002

Text

{{#Wiki_filter:W . _ . MATrptu Ta"'s"*"'D P,"'Yl'TH d'I CG'DkhisdiATEs - [[ e nog'o,, 1 NUCLEAR REGULATORY COMMISSION

REGloN ll n 0 - .E 101 M ARIETT A sTRE ET. N.W.

I ATLANT A. GEORGI A 30303 o% / ..... In Reply Refer To: MAR 141979 RII:KHB 50-335/79-2 Florida Power and Light Company ATTN: Dr. R. E. Uhrig, Vice President Advanced Systems and Technology P. O. Box 529100 Miami, Florida 33152 Gentlemen: This refers to the inspection conducted by Mr. K. H. Besecker of this office on January 17-19, 1979, of activities authorized by NRC License No. DPR-67 at St. Lucie and to the discussion of our findings held with Mr. C. M. Wethy at the conclusion of the inspection. The area examined during this inspection was your program for safeguarding special nuclear material under the applicable provisions of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials." Within this area, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors. We have examined actions you have taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report. , During the inspection, it was found that certain activities under your These items and license appear to be in noncompliance with NRC requirements. references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A. This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written state- ment or explanation in reply including: (1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Details of activities involving safeguards and security measures are exempt from disclosure in accordance with 10 CFR 2.790(d). Therefore, your response should be incorporated in a separate paper and referenced in your reply. In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosures to this letter with the exception of the report cover page, which is an inspection summary, will not be placed in the Public Document Room. 7904240 M S MATFPr.L TU"50TTED MERSVITH CD:lllMS 2ZJ 1.1f L.l.".?.I!0:1

. . . h'ATFPIAL TEM.'SWED HEP.IWITH C0H1 Al:iS 2.E31.' iia.1:../.110ii ' MAR 141979 Florida Power and Light Company -2- Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, r;f l 'mr , William B. Kenna, Chief Safeguards Branch Enclosures: 1. Appendix A, Notice of Violation (Exempt from Disclosure) 2. Inspection Report No. 50-335/79-2 (Exempt from Disclosure) 3. Inspection Summary (Not Exempt) cc w/ inspection Summary Mr. C. M. Wethy, Plant Manager St. Lucie Plant P. O. Box 128 Ft. Pierce, Florida 33450 Mr. Nat Weems, Assistant QA Manager P. O. Box 128 Ft. Pierce, Florida 33450 0 If ! I P ' }}