om 8809 UNITED STATES A
'o, NUCLE AR REGULATORY COMMISSION fI
! 7,,,, i ^,
nEGiON iv 2
611 HYAN PLAZA DRIVE, SUITE 1000 o,; 3 F
%.3
,/
'.=*
March 19, 1979 In Reply Refer To:
RIV Docket flos.
50-445/IE Bulletin flo.78-12B 50-446/IE Bulletin flo.78-128 Texas Utilities Generating Company ATTft: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
Enclosed b a supplement (IE Bulletin No.78-128) to IE Bulletin No. 78-12 and 12A which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.
Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.
Sincerely,
-Q.
0 JQf "$
2 l Rarl V. Seyfri Director
Enclosures:
1.
List of IE Bulletins Issued in Last Twelve Months 7004240103
9 UtilTED STATES flVCLEAR REGULATORY COMNISSI0fl 0FFICE OF IflSPECTI0ft Ar4D EflFORCEMEllT WASHIllGT0fi, D.C.
20555 IE Bulletin flo.78-12B Date: March 19,1979 Page 1 of 1 ATYPICAL WELD MATERIAL Ifl REACTOR PRESSURE VESSEL WELDS Description of Circumstances:
This Bulletin is a supplement to IE Bulletins 78-12 and 12A and all three documents must be collectively considered to provide an adequate response to the bulletins.
Following the issuance of IE Bulletin 78-12A, members of the Office of Inspection and Enforcement staff met with representatives from the reactor vessel manufacturers and suppliers to discuss the requirements of the bulletins.
During these meetings, detailed interpretation of the data requirements was provided based on the manufacturer's respective methods of fabrication and record systems.
Recognizing that the scope of the record review is extensive, additional time to respond to the bulletins is provided by this supplement.
Action to be Taken by Licensees and Permit Holders:
This bulletin applies to all power reactor facilities with an operating license or a construction pennit, except those already identified as possibly having atypical weld material.
Responses to the requirements in Bulletins 78-12 and 12A shall be submitted in writing in accordance with the following schedule:
1.
Generic reports from each reactor vessel manufacturer shall be submitted to the f1RC by May 1,1979.
2.
The licensee responses shall be submitted by May 29, 1979.
The licensee's response shall include all of the specific vessel information required by the bulletins which is not covered by the vessel manufacturers generic report and shall indicate that the licensee is satisfied that the generic report adequately represents data for the specific vessels covered by the licensee's report.
Approved by GAO, B180225 (R0072); clearance expires 7/31/80. Approval was given under a blanket clearance specifically for identified generic problems.
7304020054
a IE Bulletin No.78-12A March 19, 1979 LISTING OF IE BULLETINS ISSUED IN LAST TWELVE MONTHS Bulletin Subject Date Issued Issued To No.
78-05 Malfunctioning of 4/14/78 All Power Reactor Circuit Breaker Facilities with an Auxiliary Contact Operating License Mechanism - General (0L) or Construc-Electric Model tion Permit (CP)
CR105X 78-06 Defective Cutler-5/31/78 All Power Reactor Hammer, Type M Relays Facilities with an With DC Coils Operating License (0L) or Construc-tion Permit (CP) 78-07 Protection Afforded 6/12/78 All Power Reactor by Air-Line Facilities with an Respirators and Operating License (0L) and Supplied-Air all class E and F Hoods Research Reactors with an OL, all Fuel Cycle Facilitics with an OL, and all Priority 1 Material Licensees 78-08 Radiation Levels from 6/12/78 All Power and Fuel Element Transfer Research Reactor Tubes Facilities with a Fuel Element Trans-fer Tube and an Operating License (0L) 78-09 BWR Drywell Leakace 6/14/78 All BWR Power Paths Associated with Reacter Facilities Inadequate Drywell with an Operating Closures Licer.se (OL) or Construction Per-mit(CP)
Enclosure Page 1 of 3
IE Bulletin No.78-12B March 19, 1979 78-10 Bergen-Paterson 6/27/78 All BWR Power Hydraulic Shock Reactor Facilities Suppressor Accumulator with an Operating Spring Coils License (OL) or Construction Per-mit (CP) 78-11 Examination of Mark I 7/21/78 BWR Power Reactor Containment Torus Facilities for Welds action: Peach Bottom 2 and 3, Quad Cities 1 and 2, Hatch 1. Monti-cello and Vermont Yankee 78-12 Atypical Weld Material 9/26/78 All Pov.er Reactor in Reactor Pressure Facilities with an Vessel Welds Operating License (0L) or Construc-tion Permit (CP)78-12A Atypical Weld Material 11/24/78 All Power Reactor in Reactor Pressure Facilities with an Vessel Welds Operating License (OL) er Construc-tion Permit (CP) 78-13 Failures in Source 10/27/78 All General and Heads of Kay-Ray, Specific Licensees Inc., Gauges Models with Kay-Ray Gauges 7050, 70503, 7051, 7051B, 7060, 7060B, 7061 and 70618 78-14 Deterioration of 12/19/78 All GE BWR facilities Buna-N Components with an Operating in ASCO Solenoids License (OL) or Construction Permit (CP) 79-01 Environmental Quali-2/8/79 All Power Reactor fication of Class IE Facilities with an Equipment Operating License (0L) or Construction Permit (CP)
Enclosure Page 2 of 3
IE Bulletin No.78-12B March 19, 1979 79-02 Pipe Support Base 3/8/79 All Power Reactor Plate Designs Using Facilities with an Concrete Expansion Operating License Anchor Bolts (OL)orConstruction Permit (CP) 79-03 Longitudinal Weld 3/12/79 All Power Reactor Defects in ASME SA-312 Facilities and an Type 304 Stainless Operating License Steel Pipe Spools (0L) or Construction Manufactured by Permit (CP)
Youngstown Welding and Engineering Company Enclosure Page 3 of 3