ML19274E288

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99900259/78-02 on 781017-20 & Notice of Deviation
ML19274E288
Person / Time
Issue date: 11/06/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Avery P
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML19274E279 List:
References
REF-QA-99900259 NUDOCS 7903220193
Download: ML19274E288 (2)


Text

.

UNITED STATES p

4, NUCLEAR REGULATORY CO*4 MISSION

[q f,h REGION IV 5

u-

[

611 RYAN PLAZA DRIVE, GUITE 1000 fn

~

' J ARLINGTON, TEXAS 76011

~

'%,.".,<[

0 6 NOV 1973 Docket No. 99900259/78-02 Combustion Engineering, Inc.

C-E Avery Division ATTN:

Mr. P. F. Avery General Manager Old Dovar Road P.O. Box 630 Newington, Ne 4 Hampshire 03801 Gentlemen:

This refers to the QA Program inspection conducted by Mr. L. E. Ellershaw of this office on October 17-20, 1978, of your facility at Newington, New Hampshire associated with the manufacture of reactor internals and pump casings and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a curtomer are being implemented; nor to assure that a specific product, component or service provided by 'ou to your customers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.

You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of proce-dures and representative records, interviews with personnel, and observa-tions by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

79032201U

Combustion Engineering, Inc. 19 accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is nec-essary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, hEs it w-Uldis Potapovs, Chief Vendor Inspection Branch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900259/78-02