Forwards IE Insp Rept 50-271/79-02 on 790115-18.No Noncompliance Noted
ML19274E239
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/05/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19274E240 List:
References
NUDOCS 7903210020
Download: ML19274E239 (2)


See also: IR 05000271/1979002

Text

'

O

  • I Je4 afo %

o

UNITED STATES

.

.7

4

NUCLEAR REGULATORY COMMISslON

REGION I

  • ' -

C

631 PARK AVENUE

cf

KING OF PRUS$1 A. PENNSYLVANI A 19406

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Robert H. Groce

Licensing Engineer

20 Turnpike Road

Westborough, Massachusetts 01581

Gentlemen:

Subject:

Inspection 50-271/79-02

This refers to the inspection conducted by Mr. T. H. Smith of this

office on January 15-18, 1979, at Vermont Yankee Nuclear Power Station,

Vernon, Vermont, of activities authorized by NRC License No. DPR-28 and

to the discussions of our findings held by Mr. Smith with Mr. W. Conway

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe i.o be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section

2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

790321002o

.

.,

-

.

Vermont Yankee Nuclear Power

2

5 FEB 1979

Corporation

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

O

f

"

x

El on J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-271/79-02

cc w/ encl:

W. F. Conway, Plant Superintendent

S. D. Karpyak, Manager, Administrative and Technical Liaison

A. Z. Roisman, Natural Resources Defense Council (Without Report)