Forwards IE Insp Repts 50-338/78-40 & 50-339/78-35 on 781106-1208.No Noncompliance Noted
ML19274D777
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/29/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19274D778 List:
References
NUDOCS 7902260117
Download: ML19274D777 (2)


See also: IR 05000338/1978040

Text

e

f

(Cd$

Sm atCoq

UNITED STATES

,#

jo,,

NUCLEA: REGULATORY COMMISSION

%

%

)

{

o

REGtoN ll

2

$

101 M ARIETTA STREET, N.W.

ATLANTA, GEORGI A 30303

,

n

  • % ),I . *

DEC 2 91978

In Reply Refer To:

RII:MSK

50-338/78-40

50-339/78-35

Virginia Electric and Power Company

ATTN:

Mr. W. L. Proffitt

Senior Vice President, Power

Post Office Box 26666

Richmond, iirginia 23261

Gentlemen:

This refers to the inspection conducted by Mr. M. S. Kidd of this office

on November 6 through December 8,1978 of activities authorized by NRC

License Nos. NPF-4 and CPPR-78 for the North Anna Power Stat %n, Units 1

and 2 facilities, and to the discussion of our findings

with Mr. W. R.

Cartwright and others of your staff periodically during

inspection

and at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, to items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information frcm public disclosure. Any such application must

include a full statement. of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

790226OlL7

-

.. .

.

Virginia Electric and

Power Company

-2-

DEC 2 9 G78

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

R

-

s s,_

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-338/78-40

and 50-339/76-35

cc w/ enclosures:

Mr. W. R. Cartwright, Station Manager

North Anna Power Station

Box 402

Mineral, Virginia 23117

Mr. P. G. Perry