Forwards IE Insp Rept 50-341/78-20 on 781212-14.No Noncompliance Noted
ML19274D773
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/12/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19274D774 List:
References
NUDOCS 7902260107
Download: ML19274D773 (2)


See also: IR 05000341/1978020

Text

TBM

'~

.

d

j

4,

UNITED STATES

,., y

3. t

NUCLE A R REGULATORY COMMISSION

j

'[

REGION lit

,,

g

799 ROoSE V E LT RO/,D

f

"

' - . :

GLE N E LLY N. IL LINOis 00137

<'% ....* +#

. .g $ . , .

v1 .

A

b

$

Docket No. 50-34

-

Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Mr. E. '4.

K. Lee of this

office on December 12-14, 1978, of activities by NRC Construction

Permit No. CPPR-87 and to the discussion of our findings with you,

Mr. T. A. Alessi and others of the Fermi 2 project staf f at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Fede:al Regulations, a copy of this

letter and the enclosed inspr. tion repor c nill be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure.

The application must include

a full statement of the reasons for which the luformation is con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure tc the application.

7902260107

.

.

.F. ' < .

.

.

Detroit Edison Company

- 2-

We will gladly discuss any questions you have concerning this

inspection.

t

P

Sincerely.

-

.,

.

~

$

$

kn

R.

F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-341/78-20

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

s/ TIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney