From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19274D754 List:
References
NUDOCS 7902260014
Download: ML19274D753 (2)


See also: IR 05000329/1978016

Text

N,

d

UNIT E D ST ATES

c

[g

(

NUCLE AR REGULATOPY COMMISSIOU

( 3h, , d,

'

.

H L Gio:, t.

0

[

m ooon . ,

c.

,

,

s

..

~ . - .<

-

=...-

,

-3

!:

1ts

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATIN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Mr. E. W. K. Lee of this

office on November 13-16, 1978, of activities at the Midland Nuclear

Power Plant construction site, Units 1 and 2 authorized by NRC Con-

struction Permits No. CPPR-81 and No. CPPR-82 and to the discussion

of our findings with Mr. B. H. Peck, others of your staff, and others

of the Midland staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

Certain other activities, set forth in the enclosed Appendix A to

this letter, appear to be a deviation from commitments which you

have made in previous correspondence with the Commission.

Please

advise us in writing within thirty days of the corrective action you

have taken or plan to take, showing the estimated date of completion

with regard to this deviation.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the NRC's Public Document Room, except as follows.

If the enclo-

sures contain information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within twenty

days of your receipt of this letter, to withhold such information

from public disclosure.

The application must include a full statement

of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in

the application is contained in an enclosure to the application.

7 9 0 2 2 6 0 0 f(I

.

Consumers Power Company

-2-

'

'

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

pf a

a

R. F. Heishman, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A. Notice

.

of Deviation

2. IE Inspection Report

No. 50-329/78-16

and No. 50-330/78-16