ML19274D655

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-002/03L-0 & 79-003/03L-0
Date released: 10/15/2019 Download: ML19274D655


LER 79-003/03L-0 on 790116:following Reactor Trip,Turbine Driven Auxiliary Feedwater Pump Failed to Start.Caused by Trip/Throttle Valve Which Tripped Shut
ML19274D661
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/13/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D661 (1)
LER 79-002/03L-0 on 790116:120V Vital AC Bus 1B Was Deenergized When Inverter 1B Tripped Due to Components Failure.Capacitor,Air Core Choke,Resistor & Fuse Were Replaced & Inverter Returned to Svc
ML19274D657
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/13/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D657 (1)
Forwards LERs 79-002/03L-0 & 79-003/03L-0
ML19274D654
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/13/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D654 (1)