ML19274D377

From kanterella
Jump to navigation Jump to search
Forwards Non-Linear Time History Seismic Analysis for the Crystal River Unit 3 High Density Spent Fuel Storage Racks. Other Info Re Storage of Spent Fuel Will Be Submitted by 790201.Affidavit of Wp Stewart Encl
ML19274D377
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/18/1979
From: Stewart W
FLORIDA POWER CORP.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19274D378 List:
References
NUDOCS 7901230273
Download: ML19274D377 (3)


Text

= #

- OO w a a

. .($

O

' 8 00C W. P. STEWART, DIR ECTOR M[

c on.o a nic =

POWER PRODUCTION January 18, 1979 Mr. Robert W. Reid Chief Operating Reactors Branch #4 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit #3 Docket No. 50-302 Operating License No. DPR-72

Dear Mr. Reid:

In our letters of January 9, March 3 and 22, 1978, we indicated our intent to expand the spent fuel storage facilities at Crystal River Unit #3 prior to the first refueling outage at CR#3. However, due to generic licensing problems regarding the use of a poison material manufactured by Carborunuum Company, Florida Power Corporation has decided to delay the installation of high density racks at CR#3 until after the first refueling outage which is currently scheduled for April 23, 1979. Our decision to delay this project has been verbally conveyed to Mr. Chris Nelson of your staff.

Florida Power Corporation still wishes to pursue resol"rien of all NRC con-cerns not related to the poison material while that generic issue is being resolved. In this regard, we hereby submit for your staff's review three (3) originals and forty (40) copies of our revised seismic analysis pre-pared by Nuclear Ene rgy Services, Inc. entitled Non-Linear Time History Seismic Analysis for the Crystal River Unit 3 High Density Spent Fuel Storage Racks.

We are also revising Gur response to your request of August 1, 1978, to re-flect the fact that s pent fuel will be stored in Pool B adjacent to the pool in which the high density racks are to be installed. This information will be submitted on or before February 1, 1979.

'd S O 1 Z 'd O '

General Office 32o1.tarty-fourth street soutn . P O Box 14o42, st Petersburg. Fionda 33733 813-866-5151

Mr. Robert W. Reid Page 2 January 18, 1979 Should you or membe rs of your staff have any questions concerning the attached report or our change in schedule for this modification, please contact this office. ,

Very truly yours, FLORIDA POWER CORPORATION (o . 9. Au9au W. P. Stewart cc: File: 3-0-3-a-3 ECSekcR94 (1/18D6)

STATE OF FLORIDA COUNTY OF PINELLAS W.P. Stewart states that he is the Director, Power Production, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the info rmation attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, info rmation and belief.

d 1. Semo W.P. Stewart Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 19th day of January, 1979.

Y '

L}dnL A Notary Public /

Notary Public, State of Florida at Large, My Commission Expires: July 25,1980