ML19274D132

From kanterella
Jump to navigation Jump to search
Forwards LER 78-092/01T-0
Date released: 10/15/2019 Download: ML19274D132


LER 78-092/01T-0 on 781219:final Stress Rept Shows That 15 Pipe Supports Were Not Installed or Configured as Assumed in Stress Analysis.Caused by Field Revision During Const.Plant Mods Have Been Issued
ML19274D134
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/05/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D134 (4)
Forwards LER 78-092/01T-0
ML19274D131
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/05/1979
From: Furr B
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D131 (1)